Page One - 10/07/03 | ||||||||||
|
Government Projects - Island of Kauai | ||||||||||
|
K867 Lihue Airport |
General Aviation Apron, Phase II, DOT 274-3111, Project No. AK1046-28 |
10/16/03 2:00PM | ||||||||
|
Work includes demolition of existing structures, general aviation apron, Phase II, new National Weather Services buildings, installation of utilities (water, sewer, drainage, electric & communications), & other incidental related work. Estimated construction cost is between $5,000,000 - $10,000,000. Site work (demolition, removal & relocation, backfilling, clearing & grubbing, earthwork, watering, drainage system, chain link fence, asphalt concrete pavements, regulatory & warning signs, pavement striping & markings, water system, sewer system, sprinkler system, planting & transplanting), concrete (cast-in-place concrete), masonry (concrete unit masonry, glass unit masonry), metals (structural steel, cold-formed metal framing, metal fabrications), wood & plastics (rough/finish carpentry, preservative treatment of wood products, cultured marble shower panels), thermal & moisture protection (mineral fiber blanket thermal insulation, exterior insulation & finish system, flashing & sheet metal, aluminum standing seam roofing, firestopping, sealants), doors & windows (steel door frames, aluminum door & frames, wood doors, stainless steel rolling service doors, vinyl plastic windows, roll-down hurricane shutters, accordion hurricane shutters, finish hardware, glazing), finishes (metal support systems, gypsum board, ceramic tile, acoustical ceiling, resilient wall base, linoleum sheet flooring, carpet, painting), specialties (metal wall louvers, identifying devices, fire extinguishers & cabinets, toile accessories), mechanical (fuel piping & generator exhaust system, plumbing, oil water separator, A/C & ventilation), electrical (electrical work, lighting, fire alarm system, closed circuit television system). A Mandatory prebid conference & one-time-only site inspection are scheduled for 9:30 a.m. on Sept. 24, 2003 at the Mezzanine Conference Room, Lihue Airport. | ||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Dick Pacific Construction Co., Ltd 533-5000 Fax 533-5339 Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Goodfellow Brothers, Inc 879-5205 Fax 879-6724 Hawaiian Dredging Construction Co 734-3211 Fax 734-3232 Kauai Builders Ltd 245-2911 Fax 245-1769 |
Kiewit Pacific Co 674-1088 Fax 674-1233 Koga Engineering & Construction Inc 845-7829 Fax 842-9384 Pacific Coast Inspections 246-2515 Fax 652-3885 Primatech Construction Inc 952-6888 Fax 952-6889 Shioi Construction Inc 487-2441 Fax 487-2445 Site Engineering Inc 841-8883 Fax 842-0320 Unlimited Construction Services 245-7843 Fax 245-9622 | |||||||||
|
K868 Kiilua & Koloa Elementary Schools |
Playground Accessibility Improvements, DAGS 877-3305, Job No. 14-16-4141 |
10/30/03 2:00PM | ||||||||
|
Site work (selective demolition, earthwork, soil treatment for vegetation control, asphaltic concrete paving, rubber surfacing & playground equipment, lawns & Grass), concrete (cast-in-place concrete), metals (metal fabrications), finishes (painting), special construction (lead-based paint control measures), mechanical (plumbing), & other incidental related work. Estimated construction cost is between $250,000 - $500,000. | ||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 H.E.M. Construction Inc 396-1076 Fax 395-2999 |
Site Engineering Inc 841-8883 Fax 842-0320 Unlimited Construction Services 245-7843 Fax 245-9622 | |||||||||
|
K869 Kauai |
Kapaa-Kealia Bike & Pedestrian Path (RFP), C of K 241-6288/6293, Federal-Aid Project No. STP-CM-0700(48) |
10/30/03 2:00PM | ||||||||
|
This is a Design-Build project to develop a multi-use path for bicyclists, pedestrians, limited equestrian, & other users along the coastline from Kapaa to Kealia on the island of Kauai. Work includes, but is not limited to the demolition of existing structures, constructing new structures, & permitting to complete the project in conformance with applicable Federal State & County standards, codes & regulations. | ||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Dick Pacific Construction Co., Ltd 533-5000 Fax 533-5339 Goodfellow Brothers, Inc 879-5205 Fax 879-6724 Hawaiian Dredging Construction Co 734-3211 Fax 734-3232 |
Hawaiian Dredging Construction Co 734-3211 Fax 734-3232 Kauai Builders Ltd 245-2911 Fax 245-1769 Kiewit Pacific Co 674-1088 Fax 674-1233 Unlimited Construction Services 245-7843 Fax 245-9622 | |||||||||
|
K870 Kawailehua, HA 204 |
ADA Accessibility Compliance, HCDCH 587-0530/0535, Job No. 01-027-000-S(C) |
10/31/03 2:00PM | ||||||||
|
Site work (selective demolition, earthwork, soil treatment for vegetation control, asphaltic concrete paving, pavement markings, traffic signage & handrails, concrete pavement, walkways & pads), concrete (concrete formwork/reinforcement, cast-in-place concrete), masonry (concrete unit masonry), wood & plastics (finish carpentry, preservative treated lumber), thermal & moisture protection (waterproofing membrane flashing & sheet metal, sealants & caulking), doors & windows (finish hardware), finishes (gypsum board, ceramic tile, interior & exterior painting), specialties (identifying devices, toilet accessories), mechanical (plumbing), electrical (basic electrical materials & methods), & other incidental related work. The prebid site inspection meeting is scheduled at 9:30 a.m. on Monday, Oct 13, 2003 at the Kawailehua Community Center, 5220 Paanau Road, Koloa. All interested contractors & subcontractors shall confirm their visit with Nancy Hosaka, Area Manager at (808) 337,6774. Bidders will not be allowed on the site at any other time. Attendance by all bidders on this project is recommended. | ||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Close Construction, Inc 625-8673 Fax 625-3666 |
Kauai Builders Ltd 245-2911 Fax 245-1769 Stan's Contracting, Inc 935-2566 Fax 935-0700 | |||||||||