*M834 Kailua High School |
Special Ed Trailer Bldgs for 04-04, DAGS 877-3305, Job No. 12-16-4373 |
10/16/03 2:00PM | |||||||||
|
Work includes site work for trailer building, construction of lanai deck, stair, sidewalk, & accessible ramp; installation of electrical utilities & fire alarm system, & installation of plumbing utilities, & other incidental related work. Estimated construction cost is between $50,000 - $100,000. Site work (demolition & removal, patching, repair & restoration, site preparation, earthwork, soil treatment for termite control, concrete sidewalk & curb, water system, sanitary sewer, lawns & grass), metals (metal fabrications), wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (flashing & sheet metal), finishes (painting), specialties (signs, fire extinguishers), special construction (fire alarm system), electrical (underground electrical work, telecommunications). | |||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Hawaii Modular Space 682-5559 Fax 682-5199 |
Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 Tek Pacific 454-1117 Fax 455-0900 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||
|
*M835 Ulaino Road |
Flash Flood Warning Signs at Honoma'ele & Mokulehua Streams, C of Maui 270-7830, Job No. 03-14 |
10/24/03 2:00PM | |||||||||
|
The project involves resurfacing two 300'-400' sections of Ulaino Road @ Honoma'ele & Mokulehua Streams. Work includes laying an AC leveling course & overlay, installing 8" x 8" painted reinforced concrete posts, installing pavement markings, erecting warning signs, & other incidental related work. Estimated construction cost is between $75,000 - $150,000. | |||||||||||
|
*M836 Kiei Elementary School |
Telecommunication & Electrical System Improvements, DAGS 877-3305, Job No. 15-16-4033 |
10/30/03 2:00PM | |||||||||
|
Work includes site electrical/telecom ductlines & interior electrical & telecom systems improvements, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (earthwork for utilities, soil treatment for vegetation control, asphaltic concrete paving, lawns & grass), concrete (cast-in-place concrete), thermal & moisture protection (sealants), finishes (painting), electrical (electrical work, communications). | |||||||||||
|
*M837 Noho Place Roadway |
Improvements, C of Maui 270-7830, Job No. 02-26 |
10/30/03 2:00PM | |||||||||
|
Work includes repairing a portion of the pavement section at the Noho Place cul-de-sac in Pukalani, replacing the wooden barricades at the end of the cul-de-sac, & other incidental related work. Estimated construction cost is between $25,000 - $75,000. Earthwork (removal of structures & obstructions, dressing of shoulder), bases (aggregate base course), pavements (asphalt concrete pavement, bituminous tack coat), incidental construction (reinforced concrete driveways, traffic control signs), materials (bituminous materials, aggregates, cullet & cullet-mad materials). | |||||||||||
|
*M838 Honokowai Kauhale, HA E-12 |
ADA Accessibility Compliance, Add #1, HCDCH 587-0530/0535, Fax 587-0600/0588, Job No. 01-025-000-S (C) |
10/31/03 2:00PM | |||||||||
|
Site work (selective demolition & removal, site demolition & removal, earthwork, clearing, soil treatment for vegetation control, asphaltic concrete paving, pavement markings, traffic signage, lawns & grass), concrete (cast-in-place concrete), wood & plastics (carpentry, preservative treated lumber, solid surface surrounds), thermal & moisture protection (sealants), doors & windows (wood doors, aluminum screen doors, finish hardware), finishes (gypsum wallboard, ceramic tile, resilient flooring, painting), specialties (toilet partitions, misc. specialties), mechanical (plumbing), electrical (general electrical provisions, basic electrical materials & methods), & other incidental related work. The prebid site inspection meeting is scheduled at 9:00 a.m. on Tuesday, Oct 14, 2003. All interested contractors & subcontractors shall confirm their visit with Clifford Libed, Area Manager at 552-2270. Bidders will not be allowed on the site at any other time. Attendance by all bidders on this project is recommended. | |||||||||||
|
*M839 Kahale Mua, HA 205, Molokai |
ADA Accessibility Compliance, Add #1, HCDCH 587-0530/0535, Fax 587-0600/0588, Job No. 01-025-000-S (D) |
10/31/03 2:00PM | |||||||||
|
Site work (selective demolition & removal, site demolition & removal, earthwork, soil treatment for vegetation control, asphaltic concrete paving, pavement markings, traffic signage, lawns & grass), concrete (cast-in-place concrete), wood & plastics (carpentry, preservative treated lumber, solid surface surrounds), thermal & moisture protection (sealants), doors & windows (wood doors, finish hardware), finishes (gypsum wallboard, ceramic tile, resilient flooring, painting), mechanical (plumbing), electrical (general electrical provisions, basic electrical materials & methods), & other incidental related work. The prebid site inspection meeting is scheduled at 9:00 a.m. on Tuesday, Oct 14, 2003. All interested contractors & subcontractors shall confirm their visit with Clifford Libed, Area Manager at 552-2270. Bidders will not be allowed on the site at any other time. Attendance by all bidders on this project is recommended. | |||||||||||
|
If you want to be added to the plan holders list contact me at b_berning@hotmail.com Please let us know if there are any changes in your address or phone numbers. | |||||||||||
|
Page Two | ||||||||||
|
Government Projects - Island of Maui | ||||||||||
|
*M840 Maui |
Paia/Haiku District Resurfacing FY 03, C of Maui 270-7830, Job No. 02-03 |
10/31/03 2:00PM | ||||||||
|
This project involves resurfacing Hikina Place, Hema Place, Haawina Street, Pahi Ka Street, Paihi Street, Pili Loko Street, Pua Ole Street, Anohou Street, Palekana Street, Loina Place, & Kokomo Road (Haiku Road to 50,000' south), Hogback Road (off Haiku Road), Haumana Road, Haloa Road (off South Holokai Road), Haloa Road (off Kaupakalua Road), & Kaiapa Place. Work includes laying an asphalt leveling course & asphalt resurfacing course, removing & replacing speed humps, adjusting utilities, installing pavement markings, & other incidental related work. Estimated construction cost is between $500,000 - $1,000,000. | ||||||||||
|
*M841 Baldwin High School |
Eight Classroom Bldg, DAGS 877-3305, Job No. 15-16-4038 |
11/06/03 2:00PM | ||||||||
|
Work includes construction of a two story classroom building including site work (site preparation & earthwork, earthwork, utility trench excavation & backfill, soil treatment for vegetation control, underground sprinkler system, landscaping, asphalt concrete pavement, aggregate base & subbase courses, concrete ramps, sidewalks & walkways, water system, storm drainage system, sewer system, lawns & grass), concrete (cast-in-place concrete, precast prestressed concrete), masonry (unit masonry assemblies), metals (misc. metals, stair nosing, expansion joint cover assemblies), wood & plastics (rough/finish carpentry, metal-plate-connected wood trusses, treated lumber, architectural interior woodwork), thermal & moisture protection (membrane waterproofing, cold fluid-applied waterproofing, insulation, exterior finish system-class PB, firestopping, concrete tile roofing, sheet metal/flashing & trim, sealants & caulking), doors & windows (metal door frames, wood/access doors, security jalousie windows, finish hardware), finishes (gypsum drywall, ceramic tile, acoustical tile, resilient tile floor, painting), specialties (visual display boards, solid plastic & phenolic plastic toilet partitions & urinal screens, louvers & vents, aluminum security screens, identifying devices, fire extinguishers, cabinets & accessories, operable partitions, toilet accessories), equipment (laboratory fume hood workstation), furnishings (laboratory casework, furniture & equipment), special construction (fire alarm system), conveying systems (hydraulic elevators), mechanical (plumbing, A/C & ventilation, ceiling fans), electrical (ground & bonding, electrical identification, building wire & cable), electrical (raceway & boxes, wiring devices, enclosed switches, enclosed circuit breakers, panelboards, dry type transformers, interior luminaires, area of rescue assistance system, public address & music equipment), & other incidental related work. Estimated construction cost is between $1,000,000 - $5,000,000. | ||||||||||
|
10/08/03 - The Maui Economic Development Board Inc. (NEDB) is in the process of developing an office building in the Maui Research & Technology Park (MRTP) in Kihei, Maui, Hawaii. MEDB is interested in receiving competitive proposals from qualified providers of construction project management/owner's representative services. The proposed MEDB Building will be a 1 to 2 story office/laboratory shell with an estimated 30,000 sq ft' of leasable space for 4-6 high technology industry tenants. For additional details & a package of proposal documents either call or e-mail Steve Perkins at 808-875-2342 or steve@medb.org with Construction Project Management RFP REQUEST in the subject line. The documents are available via e-mail or US Mail. All competitive proposals must be received no later than 4:30PM October 20,2003 | ||||||||||
|