Page One - 10/09/03

Government Projects - Island of Maui

*M834 Kailua High School

Special Ed Trailer Bldgs for 04-04, DAGS 877-3305, Job No. 12-16-4373

10/16/03 2:00PM

Work includes site work for trailer building, construction of lanai deck, stair, sidewalk, & accessible ramp; installation of electrical utilities & fire alarm system, & installation of plumbing utilities, & other incidental related work. Estimated construction cost is between $50,000 - $100,000. Site work (demolition & removal, patching, repair & restoration, site preparation, earthwork, soil treatment for termite control, concrete sidewalk & curb, water system, sanitary sewer, lawns & grass), metals (metal fabrications),

wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (flashing & sheet metal), finishes (painting), specialties (signs, fire extinguishers), special construction (fire alarm system), electrical (underground electrical work, telecommunications).

Plan Holders of Record:

Allied Construction, Inc 841-0177 Fax 847-1402

BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807

Hawaii Modular Space 682-5559 Fax 682-5199

Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971

Tek Pacific 454-1117 Fax 455-0900

Universal Construction, Inc 845-3986 Fax 842-3881

*M835 Ulaino Road

Flash Flood Warning Signs at Honoma'ele & Mokulehua Streams,

C of Maui 270-7830, Job No. 03-14

10/24/03 2:00PM

The project involves resurfacing two 300'-400' sections of Ulaino Road @ Honoma'ele & Mokulehua Streams. Work includes laying an AC leveling course & overlay, installing 8" x 8" painted reinforced concrete posts, installing pavement markings, erecting warning signs, & other incidental related work. Estimated construction cost is between $75,000 - $150,000.

*M836 Kiei Elementary School

Telecommunication & Electrical System Improvements,

DAGS 877-3305, Job No. 15-16-4033

10/30/03 2:00PM

Work includes site electrical/telecom ductlines & interior electrical & telecom systems improvements, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (earthwork for utilities, soil treatment for vegetation control, asphaltic concrete paving, lawns & grass), concrete (cast-in-place concrete), thermal & moisture protection (sealants), finishes (painting), electrical (electrical work, communications).

*M837 Noho Place Roadway

Improvements, C of Maui 270-7830, Job No. 02-26

10/30/03 2:00PM

Work includes repairing a portion of the pavement section at the Noho Place cul-de-sac in Pukalani, replacing the wooden barricades at the end of the cul-de-sac, & other incidental related work. Estimated construction cost is between $25,000 - $75,000. Earthwork (removal of structures & obstructions, dressing of shoulder), bases (aggregate base course), pavements (asphalt concrete pavement, bituminous tack coat), incidental construction (reinforced concrete driveways, traffic control signs), materials (bituminous materials, aggregates, cullet & cullet-mad materials).

*M838 Honokowai Kauhale, HA E-12

ADA Accessibility Compliance, Add #1, HCDCH 587-0530/0535,

Fax 587-0600/0588, Job No. 01-025-000-S (C)

10/31/03 2:00PM

Site work (selective demolition & removal, site demolition & removal, earthwork, clearing, soil treatment for vegetation control, asphaltic concrete paving, pavement markings, traffic signage, lawns & grass), concrete (cast-in-place concrete), wood & plastics (carpentry, preservative treated lumber, solid surface surrounds), thermal & moisture protection (sealants), doors & windows (wood doors, aluminum screen doors, finish hardware), finishes (gypsum wallboard, ceramic tile, resilient flooring, painting), specialties (toilet partitions, misc. specialties), mechanical (plumbing), electrical (general electrical provisions, basic electrical materials & methods), & other incidental related work. The prebid site inspection meeting is scheduled at 9:00 a.m. on Tuesday, Oct 14, 2003. All interested contractors & subcontractors shall confirm their visit with Clifford Libed, Area Manager at 552-2270. Bidders will not be allowed on the site at any other time. Attendance by all bidders on this project is recommended.

*M839 Kahale Mua, HA 205, Molokai

ADA Accessibility Compliance, Add #1, HCDCH 587-0530/0535,

Fax 587-0600/0588, Job No. 01-025-000-S (D)

10/31/03 2:00PM

Site work (selective demolition & removal, site demolition & removal, earthwork, soil treatment for vegetation control, asphaltic concrete paving, pavement markings, traffic signage, lawns & grass), concrete (cast-in-place concrete), wood & plastics (carpentry, preservative treated lumber, solid surface surrounds), thermal & moisture protection (sealants), doors & windows (wood doors, finish hardware), finishes (gypsum wallboard, ceramic tile, resilient flooring, painting), mechanical (plumbing), electrical (general electrical provisions, basic electrical materials & methods), & other incidental related work. The prebid site inspection meeting is scheduled at 9:00 a.m. on Tuesday, Oct 14, 2003. All interested contractors & subcontractors shall confirm their visit with Clifford Libed, Area Manager at 552-2270. Bidders will not be allowed on the site at any other time. Attendance by all bidders on this project is recommended.

If you want to be added to the plan holders list contact me at b_berning@hotmail.com

Please let us know if there are any changes in your address or phone numbers.


Page Two

Government Projects - Island of Maui

*M840 Maui

Paia/Haiku District Resurfacing FY 03, C of Maui 270-7830,

Job No. 02-03

10/31/03 2:00PM

This project involves resurfacing Hikina Place, Hema Place, Haawina Street, Pahi Ka Street, Paihi Street, Pili Loko Street, Pua Ole Street, Anohou Street, Palekana Street, Loina Place, & Kokomo Road (Haiku Road to 50,000' south), Hogback Road (off Haiku Road), Haumana Road, Haloa Road (off South Holokai Road), Haloa Road (off Kaupakalua Road), & Kaiapa Place. Work includes laying an asphalt leveling course & asphalt resurfacing course, removing & replacing speed humps, adjusting utilities, installing pavement markings, & other incidental related work. Estimated construction cost is between $500,000 - $1,000,000.

*M841 Baldwin High School

Eight Classroom Bldg, DAGS 877-3305, Job No. 15-16-4038

11/06/03 2:00PM

Work includes construction of a two story classroom building including site work (site preparation & earthwork, earthwork, utility trench excavation & backfill, soil treatment for vegetation control, underground sprinkler system, landscaping, asphalt concrete pavement, aggregate base & subbase courses, concrete ramps, sidewalks & walkways, water system, storm drainage system, sewer system, lawns & grass), concrete (cast-in-place concrete, precast prestressed concrete), masonry (unit masonry assemblies), metals (misc. metals, stair nosing, expansion joint cover assemblies), wood & plastics (rough/finish carpentry, metal-plate-connected wood trusses, treated lumber, architectural interior woodwork), thermal & moisture protection (membrane waterproofing, cold fluid-applied waterproofing, insulation, exterior finish system-class PB, firestopping, concrete tile roofing, sheet metal/flashing & trim, sealants & caulking), doors & windows (metal door frames, wood/access doors, security jalousie windows, finish hardware), finishes (gypsum drywall, ceramic tile, acoustical tile, resilient tile floor, painting), specialties (visual display boards, solid plastic & phenolic plastic toilet partitions & urinal screens, louvers & vents, aluminum security screens, identifying devices, fire extinguishers, cabinets & accessories, operable partitions, toilet accessories), equipment (laboratory fume hood workstation), furnishings (laboratory casework, furniture & equipment), special construction (fire alarm system), conveying systems (hydraulic elevators), mechanical (plumbing, A/C & ventilation, ceiling fans), electrical (ground & bonding, electrical identification, building wire & cable), electrical (raceway & boxes, wiring devices, enclosed switches, enclosed circuit breakers, panelboards, dry type transformers, interior luminaires, area of rescue assistance system, public address & music equipment), & other incidental related work. Estimated construction cost is between $1,000,000 - $5,000,000.

10/08/03 - The Maui Economic Development Board Inc. (NEDB) is in the process of developing an office building in the Maui Research & Technology Park (MRTP) in Kihei, Maui, Hawaii. MEDB is interested in receiving competitive proposals from qualified providers of construction project management/owner's representative services. The proposed MEDB Building will be a 1 to 2 story office/laboratory shell with an estimated 30,000 sq ft' of leasable space for 4-6 high technology industry tenants. For additional details & a package of proposal documents either call or e-mail Steve Perkins at 808-875-2342 or steve@medb.org with

Construction Project Management RFP REQUEST in the subject line. The documents are available via e-mail or US Mail. All competitive proposals must be received no later than 4:30PM October 20,2003

Make sure you make note of our change of address, 73-1282 Awakea St. Kailua Kona