Page One - 10/07/03 | ||||||||||||||||||||||||||
|
| ||||||||||||||||||||||||||
|
O900 Oahu $1,800,000 Estimated Cost |
Resurfacing of a Portion of King Street, South Street to McCulley Street, Add #1-3, C of H 523-4682 Fax 423-4847, Job No. 28-03, Project Engineer: Darin Chinen @ 527-7194 |
10/09/03 2:00PM | ||||||||||||||||||||||||
|
Work includes resurfacing an average 2-1/2" thickness of a portion of King Street, South Street to McCully Street; if necessary, adjustment of street monuments, storm drain, manholes, sewer manholes, Board of Water Supply/Verizon/Heco manholes, & the Gas Company manholes on all streets being resurfaced under this contract; restoring all pavement vehicle loop detectors, striping, markings & markers, & other incidental related work. | ||||||||||||||||||||||||||
|
Plan Holders of Record: Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Grace Pacific Corporation 487-7916 Fax 486-8025 Hawaiian Dredging Construction Co 734-3211 Fax 734-3232 KD Construction, Inc 847-0229 Fax 851-7311 |
Kiewit Pacific Co 674-1088 Fax 674-1233 Road Builders Corporation 833-5400 Fax 833-1300 Rons Construction Corp 841-6151 Fax 842-1451 Royal Contracting Co., Ltd 839-9006 Fax 839-7571 | |||||||||||||||||||||||||
|
O895 Various Locations $570,300 Estimated Cost |
Curb Ramps, C of H 523-4682 Fax 423-4847, Add #1-3, Job No. 11-03, Project Engineer: Harold Sato @ 527-6244 |
10/09/03 2:00PM | ||||||||||||||||||||||||
|
Work includes demolish & remove existing pavements, curbs, gutters, sidewalks; remove & salvage existing lava rock curbs within construction areas, clean & deliver salvaged lava rock curbs to City's Corporation Yard; construct new sidewalks, wheelchair ramps & driveways, street monument covers, utility boxes to finish grade; replace and/or install street striping & raised pavement markers, & other incidental related work. | ||||||||||||||||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 C C Engineering & Construction, Inc 848-2032 Fax 841-1807 D & C Construction, Inc 247-1234 Fax 239-5447 Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Global Specialty Contractors, Inc 843-8881 Fax 843-8883 Haron Engineering 456-2069 Fax 455-8190 Hawaii Waters Tech, Ltd 486-1400 Fax 486-1726 T. Iida Contracting, Ltd 247-4241 Fax 235-1378 |
Kaikor Construction Assoc., Inc 839-8033 Fax 839-2787 Albert C. Kobayashi, Inc 671-6460 Fax 676-5832 Mega Construction, Inc 839-0022 Fax 839-7191 Okada Trucking Co., Ltd 841-0138 Fax 847-4983 Perfecto Engineering & Const Services 681-6618 Fax 681-6486 Projects Plus, Inc 839-0044 Fax 833-1287 RMY Construction, Inc 596-8003 Fax 596-8015 Road Builders Corporation 833-5400 Fax 833-1300 Rons Construction Corp 841-6151 Fax 842-1451 Site Engineering Inc 841-8883 Fax 842-0320 | |||||||||||||||||||||||||
|
O922 Kaimiloa Elementary School |
Electrical System Upgrade, DAGS 586-0518, Job No. 12-16-4012 |
10/09/03 2:00PM | ||||||||||||||||||||||||
|
Site work (demolition & removal, excavation, backfilling & compaction for utilities, lawns & grasses), concrete (concrete work, boring & chipping), finishes (interior & exterior repainting), special construction (lead-based paint control measures), electrical (electrical work), & other incidental related work. Estimated construction cost is between $100,000 - $250,000. | ||||||||||||||||||||||||||
|
Plan Holders of Record: Ampco Electrical Services 842-0244 Fax 848-5034 C & C Electrical Contractor 847-6337 Fax 848-2831 Commercial Electric Inc 841-4595 Fax 842-0455 Electricians, Inc 839-2242 Fax 839-1344 Fopco 682-7161 Fax 682-4178 KD Construction, Inc 847-0229 Fax 851-7311 Kokami Electric Services Inc 488-9779 Fax 488-7991 |
M H Electric 833-8499 Fax 833-3321 M & R Electrical Services 845-2579 Fax 847-4399 Nakai Electrical Service, Inc 841-6131 Fax 841-6133 Paul's Electrical Service, Inc 486-9866 Fax 486-0736 M. Sakuma Electric, Inc 847-7173 Fax 847-2337 Standard Electric, Inc 836-1677 Fax 834-1836 Ted's Wiring Service, Ltd 845-3533 Fax 842-0705 Wasa Electrical Services, Inc 839-2741 Fax 836-0887 | |||||||||||||||||||||||||
|
O923 Aiea High School |
Bldg E (Library) - Replace A/C Equipment, DAGS 586-0518, Job No. 57-16-3547 |
10/09/03 2:00PM | ||||||||||||||||||||||||
|
Work includes the replacement of existing air handling unit & air cooled condensing unit & associated work; associated work includes but not limited to the following: ductwork cleaning, limited electrical modifications, painting, hazardous material mediation, modification of condensing unit room, required opening through concrete/CMU walls, rebalancing of existing air distribution system & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Wood & plastics (rough carpentry, preservative treated lumber), finishes (painting), special construction (removal & disposal of asbestos containing materials, testing/air monitoring), mechanical (A/C & ventilation, mechanical cleaning of HVAC systems), electrical (electrical general requirements, interior wiring systems). | ||||||||||||||||||||||||||
|
Plan Holders of Record: A's Mechanical LLC 421-1400 Fax 421-1477 Advanced A/C Inc 847-4814 Fax 842-6480 AL & C Mechanical & A/C Corp 841-6262 Fax 841-6262 Alaka'i Mechanical Corp 834-1085 Fax 834-1800 Commercial Sheetmetal Co., Inc 671-4002 Fax 676-7965 Continental Mechanical of the Pacific 845-5936 Fax 846-4232 Diversified Plumbing & A/C 845-1335 Fax 847-7864 Economy Plumbing & Sheetmetal, Inc 842-5100 Fax 848-2703 |
Honolulu Shipyard, Inc 848-6422 Fax 848-6426 KD Construction, Inc 847-0229 Fax 851-7311 Master Sheet Metal Inc 847-2128 Fax 847-2131 Oahu Plumbing & Sheetmetal, Ltd 848-0205 Fax 848-0210 Stan's Contracting, Inc 935-2566 Fax 935-0700 Standard Sheetmetal & Mechanical Inc 839-0909 Fax 836-7927 T. Taketa Sheet Metal 845-9541 Fax 842-7641 Universal Air Conditioning 671-5516 Fax 671-5502 Xcel Sheetmetal 456-2886 Fax 456-1443 | |||||||||||||||||||||||||
|
Page Two | |||||||||||||||||||||
|
| |||||||||||||||||||||
|
O924 Nanakuli Elementary School |
Playground Accessibility Improvements & Fence, Add #1, DAGS 586-0518, Job No. 12-16-4126 |
10/09/03 2:00PM | |||||||||||||||||||
|
Work includes demolition & removal work grading work, new concrete stair, wheelchair lift installation, enclosure construction, chain link fencing, mechanical, ventilation, power, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (demolition, removal & relocation, clearing, earthwork, soil treatment for vegetation control, chain link fences & gates, Portland cement concrete paving, lawns & grass), concrete (cast-in-place concrete), metals (metal fabrications), thermal & moisture protection (manufactured roof panels, sealants), finishes (painting), specialties (signage), conveying system (wheelchair lift), mechanical (A/C) electrical (basic electrical materials & methods). | |||||||||||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 C C Engineering & Construction, Inc 848-2032 Fax 841-1807 FordAble Construction, LLC 676-9959 Fax 676-9618 Henry's Equipment Rental & Sales Inc 696-2879 Fax 696-7837 Index Builders, Inc 689-7168 Fax 689-0654 Mega Construction, Inc 839-0022 Fax 839-7191 MJ Construction Co 678-2621 Fax 676-0650 R.I. Namba Construction, Inc 839-1786 Fax 836-4989 Oceanic Companies, Inc 843-8300 Fax 843-2800 |
Okada Trucking Co., Ltd 841-0138 Fax 847-4983 PER, Inc 842-7850 Fax 842-7705 Pioneer Contracting Co., Ltd 622-4161 Fax 621-0523 Prime Construction, Inc 833-3091 Fax 833-3141 Road Builders Corporation 833-5400 Fax 833-1300 Rons Construction Corp 841-6151 Fax 842-1451 Site Engineering Inc 841-8883 Fax 842-0320 StarCom Builders Inc 952-6088 Fax 952-6588 Tek Pacific 454-1117 Fax 455-0900 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||||||||||
|
O925 Waikiki Aquarium |
Improvements, Phase 1A - Additional Repairs, Add #1, DAGS 586-0518, Job No. 12-31-4093 |
10/09/03 2:00PM | |||||||||||||||||||
|
Work includes retexturing of concrete walkways, repair of spalled concrete surfaces at display tanks, repair of concrete cracks using epoxy injection, repair of waterproofing membranes in planter boxes, & repairs to various mechanical & electrical equipment, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Special precautions shall be taken for the protection of exhibited animal at the facility. Concrete (concrete restoration, concrete crack repair), plastics (exhibit plastic fabrication), moisture protection (planter box membrane waterproofing, cementitious crystalline waterproofing), mechanical (electrical exhaust fan), electrical (electrical work). | |||||||||||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Beachside Roofing 833-6607 Fax 682-0704 Ching Construction 842-1844 Fax 841-7138 Color Dynamics Inc 848-7000 Fax 842-0800 FordAble Construction, LLC 676-9959 Fax 676-9618 GC & C Contractors Inc 306-6693 Fax 261-1359 Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Global Specialty Contractors, Inc 843-8881 Fax 843-8883 |
Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 International Roofing & Bldg Const 456-2880 Fax 455-6722 KD Construction, Inc 847-0229 Fax 851-7311 R.I. Namba Construction, Inc 839-1786 Fax 836-4989 Oceanic Companies, Inc 843-8300 Fax 843-2800 Pacific Tradewinds Enterprises 841-7937 Fax 842-0579 PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 StarCom Builders Inc 952-6088 Fax 952-6588 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||||||||||
|
O927 Blaisdell Center $1,772,640 Estimated Cost |
Concert Hall Reroofing & A/C System Upgrade, C of H 523-4682 Fax 423-4847, Job No. V-06-03-C, Project Engineer: Clifford Lau @ 527-6373 |
10/09/03 2:00PM | |||||||||||||||||||
|
Site work (demolition), concrete (concrete formwork/reinforcement, cast-in-place concrete, precast prestressed concrete), metals (misc. metal), thermal & moisture protection (building insulation, exterior finish system, single ply membrane roofing, flashing & sheet metal, roofing traffic pads, caulking & sealants), doors & windows (steel doors & frames, finish hardware), finishes (painting), specialties (fixed & acoustical louvers), special construction (removal & disposal of asbestos-containing materials, removal & disposal of lead paint), mechanical (plumbing, chilled water & condenser water piping & accessories, A/C & ventilating, direct digital control systems), electrical (electrical work), & other incidental related work. | |||||||||||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Beachside Roofing 833-6607 Fax 682-0704 Civil-Mechanical Contractor 487-7094 Fax 488-3358 FordAble Construction, LLC 676-9959 Fax 676-9618 Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Honolulu Shipyard, Inc 848-6422 Fax 848-6426 |
Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 International Roofing & Bldg Const 456-2880 Fax 455-6722 KD Construction, Inc 847-0229 Fax 851-7311 Oceanic Companies, Inc 843-8300 Fax 843-2800 Pacific Tradewinds Enterprises 841-7937 Fax 842-0579 PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 Rons Construction Corp 841-6151 Fax 842-1451 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||||||||||
|
There will be a password required soon. Without the password you won't be able to access the website. Contact Barron at 808-331-1597. | |||||||||||||||||||||
|
Page Three | |||||||||||||
|
| |||||||||||||
|
O926 Kaimiloa Elementary School |
Upgrade Fire Alarm System, DAGS 586-0518, Job No. 58-16-3667 |
10/09/03 2:00PM | |||||||||||
|
Site work (patching, repair & restoration), special construction (fire alarm systems), electrical (basic electrical materials & methods), & other incidental related work. Estimated construction cost is between $100,000 - $250,000. | |||||||||||||
|
Plan Holders of Record: Ampco Electrical Services 842-0244 Fax 848-5034 C & C Electrical Contractor 847-6337 Fax 848-2831 Commercial Electric Inc 841-4595 Fax 842-0455 Electricians, Inc 839-2242 Fax 839-1344 Kokami Electric Services Inc 488-9779 Fax 488-7991 M H Electric 833-8499 Fax 833-3321 M & R Electrical Services 845-2579 Fax 847-4399 |
Mauna Kea Electric 621-0866 Fax 622-1584 Nakai Electrical Service, Inc 841-6131 Fax 841-6133 Paul's Electrical Service, Inc 486-9866 Fax 486-0736 M. Sakuma Electric, Inc 847-7173 Fax 847-2337 Standard Electric, Inc 836-1677 Fax 834-1836 Ted's Wiring Service, Ltd 845-3533 Fax 842-0705 Wasa Electrical Services, Inc 839-2741 Fax 836-0887 | ||||||||||||
|
O936 Kipapa Elementary School |
Various Bldgs - Replace Carpet & Tiles, Add #1, DAGS 586-0518, Job No. 57-16-5214 |
10/09/03 2:00PM | |||||||||||
|
Work includes the removal of existing carpet & the installation of new carpet & vinyl composition tile, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. | |||||||||||||
|
Plan Holders of Record: Alii Flooring, Inc 487-5535 Fax 486-8840 Fine Flooring Products 841-2884 Fax 841-2886 |
Floortech Inc 847-5581 Fax 841-1943 Society Contracting LLC 455-8157 Fax 455-1403 | ||||||||||||
|
O937 University of Hawaii at Manoa |
Repair/Replace Switchgear at Physical Education/Athletics Complex, U of H 956-8687/8641, IFB No. 04-037 |
10/10/03 2:30PM | |||||||||||
|
Work includes removing & replacing two (2) interrupter switches one at a time, fabricating new enclosures for the new switches in accordance with NEC requirements, removing existing Distribution Panel 4A, providing new branch circuit breakers in an existing switchboard to serve the existing loads of Distribution Panel 4A, providing new conduits & wiring, servicing & testing the existing 3000 amp secondary main power circuit breaker which includes inspecting, testing, cleaning & replacing parts per the breaker manufacturer's requirement as for reliable & proper operation; provide an Engineering Testing & Evaluation Report, test completed installation, & other incidental related work. | |||||||||||||
|
Plan Holders of Record: American Electric Co., Ltd 848-0751 Fax 842-7980 Ampco Electrical Services 842-0244 Fax 848-5034 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 C & C Electrical Contractor 847-6337 Fax 848-2831 |
Commercial Electric Inc 841-4595 Fax 842-0455 Electricians, Inc 839-2242 Fax 839-1344 KD Construction, Inc 847-0229 Fax 851-7311 Standard Electric, Inc 836-1677 Fax 834-1836 Ted's Wiring Service, Ltd 845-3533 Fax 842-0705 | ||||||||||||
|
O885 Oahu $23,000,000 Estimated Cost |
Ala Moana Wastewater Pump Station - Modification, Add #1-2, C of H 523-4682 Fax 423-4847, Job No. 03-068, Project Engineer: Edmond Lung @ 748-5831 |
10/14/03 4:00PM | |||||||||||
|
Site work (demolition, site preparation, control of water, earthwork (grading), structure excavation & backfill, excavation/trenching, backfilling for utilities system, crushed rock, treated bases, soil stabilization by jet grouting, soil erosion control, geotextiles filter fabric, paving & surfacing, exterior process piping, high density polyethylene pipe, temporary tapping valves/plugs & appurtenances, soil irrigation, landscape irrigation system, landscape planting), concrete (concrete formwork, reinforcing steel, cast-in-place concrete), masonry (concrete unit masonry, glass unit masonry), metals (metal fabrications), wood & plastics (fiberglass reinforced plastic (FRP) structures), thermal & moisture protection (exterior deck coating, membrane sheet roofing, elastomeric deck coating, flashing & sheet metal, sealants), doors & windows (steel doors/frames, aluminum flush doors/frames, metal windows, finish hardware, glazing), finishes (lath & plaster, ceramic/quarry tile, acoustical ceilings, interior acoustical insulation panels, protective coating, water plug coating for existing concrete & masonry surfaces, rehabilitation & protection of wet well, painting), specialties (signs), equipment (vibration & critical speed limitations, vibration isolation systems, equipment mounting, electric motors, sluice gates/fabricated slide gates & operators, wastewater pumps, modifications to existing wastewater pumps, odor control system), special construction (asbestos abatement, lead containing paint removal/treatment, air monitoring & testing, fuel storage tank, piping & appurtenances, control strategies, instrumentation, toxic gas monitors, instrumentation input/output schedule), mechanical (process piping, A/C & ventilation), electrical (exterior & interior electrical work, supervisory control & data acquisition (SCADA) system, adjustable frequency drives, engine generator & accessories, low voltage switchgear), & other incidental related work. Mandatory presubmittal conference on 08/25/03 @ 9:00am at the Neal S. Blasidell Center, Oahu Room, 777 Ward Ave., Honolulu. | |||||||||||||
|
Plan Holders of Record: ClearWater 425-503-4201 Frank Coluccio Construction Co 682-4477 Fax 682-3995 Dick Pacific Construction Co., Ltd 533-5000 Fax 533-5339 Goodfellow Brothers, Inc 879-5205 Fax 879-6724 |
Hawaiian Dredging Construction Co 734-3211 Fax 734-3232 KD Construction, Inc 847-0229 Fax 851-7311 Kiewit Pacific Co 674-1088 Fax 674-1233 Oceanic Companies, Inc 843-8300 Fax 843-2800 Safety Systems Hawaii 847-4017 | ||||||||||||
|
Check the web site for additional projects, which should be posted by Wednesday. | |||||||||||||
|
Page Four | ||||||||||||||
|
| ||||||||||||||
|
O928 Kekuanaoa Bldg. |
Various Repairs, DAGS 586-0518, Job No. 62-10-0310 |
10/16/03 2:00PM | ||||||||||||
|
The work shall generally consist of: 1) repairs to exterior walls, 2) repainting of exterior walls, 3) replacement of A/C cooling towers. Bidders are required to attend the mandatory pre-bid meeting & the State conducted site visit. No other time for a site inspection will be scheduled or allowed. The pre-bid meeting & the accompanying State conducted site visit will be held at the front steps of the Kekuanaoa Bldg on September 22, 2003 at 10:am. | ||||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Constructors Hawaii, Inc 848-2455 Fax 842-3509 FordAble Construction, LLC 676-9959 Fax 676-9618 Jas. W. Glover, Ltd 935-0871 Fax 961-9237 T. Iida Contracting, Ltd 247-4241 Fax 235-1378 |
Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 KSC Painting & Construction 842-3666 Fax 842-4191 Oceanic Companies, Inc 843-8300 Fax 843-2800 Projects Plus, Inc 839-0044 Fax 833-1287 S & M Sakamoto, Inc 456-4717 Fax 456-7202 Society Contracting LLC 455-8157 Fax 455-1403 Stan's Contracting, Inc 935-2566 Fax 935-0700 | |||||||||||||
|
O929 Aloha Stadium |
Lower Level Concourse Improvements, DAGS 586-0518, Job No. 12-10-0273 |
10/16/03 2:00PM | ||||||||||||
|
Work includes the removal of existing corrugated steel decking & the installation of new steel decking, the removal of existing concrete topping & the installation of a new concrete topping, the application of a non-skid waterproof coating on concourse surfaces, the preparation of adjacent support & structural members to accommodate decking installation, & other misc. concourse improvement work for the Lower Level Concourse movable stands, & other incidental related work. Estimated construction cost is between $500,000 - $1,000,000. Site work (demolition & removal), concrete (concrete work, specially finished concrete surfaces), metals (metal decking), thermal & moisture protection (waterproofing), finishes (painting), special construction (disturbance of lead-containing materials, testing/air monitoring). | ||||||||||||||
|
Plan Holders of Record: Abhe & Svoboda, Inc 682-4833 Fax 682-0780 Allied Construction, Inc 841-0177 Fax 847-1402 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Beachside Roofing 833-6607 Fax 682-0704 C C Engineering & Construction, Inc 848-2032 Fax 841-1807 Color Dynamics Inc 848-7000 Fax 842-0800 Global Specialty Contractors, Inc 843-8881 Fax 843-8883 Ideal Construction, Inc 848-0502 Fax 842-7010 Index Builders, Inc 689-7168 Fax 689-0654 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
International Roofing & Bldg Const 456-2880 Fax 455-6722 Kaikor Construction Assoc., Inc 839-8033 Fax 839-2787 Robert M. Kaya Builders Inc 845-6477 Fax 845-6471 KD Construction, Inc 847-0229 Fax 851-7311 MJ Construction Co 678-2621 Fax 676-0650 Oceanic Companies, Inc 843-8300 Fax 843-2800 Pacific Tradewinds Enterprises 841-7937 Fax 842-0579 PER, Inc 842-7850 Fax 842-7705 Primatech Construction Inc 952-6888 Fax 952-6889 Projects Plus, Inc 839-0044 Fax 833-1287 Tek Pacific 454-1117 Fax 455-0900 Universal Construction, Inc 845-3986 Fax 842-3881 | |||||||||||||
|
O937 Kalani High School |
Electrical & Telecom System Upgrade, DAGS 586-0518, Job No. 12-16-4024 |
10/16/03 2:00PM | ||||||||||||
|
Work includes upgrade electrical utility service to the lower campus distribution system; provide new underground primary infrastructure including ductlines & concrete transformer pad for a new HECO pad-mounted transformer; provide new secondary ductlines handholes, exterior switchboard, concrete equipment pad, & underground wiring; site work including sawcutting & patching exciting AC pavements & concrete walkways; upgrade secondary electrical services at various buildings; replace existing panelboards/load centers with new panelboards; some existing panels are flush-mounted in concrete walls; replacement of these panels/load centers will require existing wall openings to be enlarged & deepened as necessary to accommodate the new larger flush-mounted panels; walls must be chipped & patched to allow exposed conduits to be connected to flush-mounted panels; provide new feeders, receptacles & branch circuits; provide new telecom outlets, junction outlets, junction boxes, & empty conduits with pull strings; demolition (removal & disposal), of certain electrical equipment & cables; repair of existing telecommunication conduits, providing new supports for existing telecommunication conduits; painting of all areas exposed by demolition work & all of new electrical installations; hazardous materials remediation & disposal including removal & disposal of existing asbestos-containing materials, & other incidental related work. Estimated construction cost is between $500,000 - $1,000,000. | ||||||||||||||
|
Plan Holders of Record: Bivens Electric 455-5222 Fax 455-5223 C & C Electrical Contractor 847-6337 Fax 848-2831 Commercial Electric Inc 841-4595 Fax 842-0455 Electricians, Inc 839-2242 Fax 839-1344 Henkels & McCoy, Inc 455-1310 Fax 455-1710 KD Construction, Inc 847-0229 Fax 851-7311 Kokami Electric Services Inc 488-9779 Fax 488-7991 |
M H Electric 833-8499 Fax 833-3321 Mauna Kea Electric 621-0866 Fax 622-1584 Paul's Electrical Service, Inc 486-9866 Fax 486-0736 M. Sakuma Electric, Inc 847-7173 Fax 847-2337 Standard Electric, Inc 836-1677 Fax 834-1836 Ted's Wiring Service, Ltd 845-3533 Fax 842-0705 Wasa Electrical Services, Inc 839-2741 Fax 836-0887 | |||||||||||||
|
If you have a project that you want a picture for the web site contact Barron | ||||||||||||||
|
Page Five | |||||||||||||
|
| |||||||||||||
|
O938 King Intermediate School |
Accessible Restroom & Walkway, DAGS 586-0518, Job No. 12-16-4219 |
10/16/03 2:00PM | |||||||||||
|
Site work (demolition & removal, selective demolition, earthwork, drainage, concrete walkways & ramps, lawns & grass), concrete (cast-in-place concrete, concrete ramp), wood & plastics (finish carpentry, treated lumber), thermal & moisture protection (membrane waterproofing, modified bitumen sheet flashing-torched on, flashing & sheet metal, sealants), doors & windows (wood doors, finish hardware), finishes (gypsum wallboard, ceramic tile, acoustical ceiling, resilient flooring, painting), specialties (signage, toilet accessories, misc. specialties), special construction (removal & disposal of asbestos containing materials, fire alarm & detection system), mechanical (insulation of mechanical systems, plumbing system: basic materials & methods, plumbing fixtures & trim), electrical (lighting), & other incidental related work. Estimated construction cost is between $100,000 - $250,000. | |||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Bonded Construction 832-0822 Fax 832-0826 Diversified Plumbing & A/C 845-1335 Fax 847-7864 FordAble Construction, LLC 676-9959 Fax 676-9618 Henry's Equipment Rental & Sales Inc 696-2879 Fax 696-7837 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 KD Construction, Inc 847-0229 Fax 851-7311 |
KSC Painting & Construction 842-3666 Fax 842-4191 MJ Construction Co 678-2621 Fax 676-0650 Oceanic Companies, Inc 843-8300 Fax 843-2800 Okada Trucking Co., Ltd 841-0138 Fax 847-4983 PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 Stan's Contracting, Inc 935-2566 Fax 935-0700 StarCom Builders Inc 952-6088 Fax 952-6588 Tek Pacific 454-1117 Fax 455-0900 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||
|
O939 Manoa Elementary School |
Bldg V - Replace A/C Chiller, DAGS 586-0518, Job No. 52-16-3614 |
10/16/03 2:00PM | |||||||||||
|
Site work (selective demolition), thermal & moisture protection (sealants), finishes (painting), specialties (metal wall louvers), mechanical (noise & vibration control, A/C & ventilation), electrical (basic electrical methods & materials), & other incidental related work. Estimated construction cost is between $100,000 - $250,000. | |||||||||||||
|
Plan Holders of Record: A's Mechanical LLC 421-1400 Fax 421-1477 Alaka'i Mechanical Corp 834-1085 Fax 834-1800 Civil-Mechanical Contractor 487-7094 Fax 488-3358 Commercial Sheetmetal Co., Inc 671-4002 Fax 676-7965 Continental Mechanical of the Pacific 845-5936 Fax 846-4232 Diversified Plumbing & A/C 845-1335 Fax 847-7864 |
Economy Plumbing & Sheetmetal, Inc 842-5100 Fax 848-2703 Honolulu Shipyard, Inc 848-6422 Fax 848-6426 KD Construction, Inc 847-0229 Fax 851-7311 Oahu Plumbing & Sheetmetal, Ltd 848-0205 Fax 848-0210 Quality Sheetmetal & A/C 841-8761 Fax 841-0527 T. Taketa Sheet Metal 845-9541 Fax 842-7641 | ||||||||||||
|
O931 Oahu |
Design/Build Execution of Skate Parks, C of H 523-4682 Fax 423-4847, Project Engineer: Clifford Lau @ 527-6373 |
10/20/03 4:00PM | |||||||||||
|
The project is the execution of various skate park facilities through the design/build method. The following skateboard projects, as identified in the fiscal year FY 03-04 Capital Budget Ordinance may include, but not limited to: (A) Skate Facility - Council District VII, Project No. 2003104 (FY 03), (B) Kapolei Regional Park, Project No. 1973116 (FY 04). Both projects referenced above have design & construction funding. Prebid Conference on 09/23/03 @ 2:00p.m. at the Honolulu Municipal Bldg., 9th Floor Conference Rm, 650 South King Street, Honolulu. | |||||||||||||
|
Plan Holders of Record: Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
PER, Inc 842-7850 Fax 842-7705 | ||||||||||||
|
O932 Pearl City Elementary School |
Various Classrooms, A/C Systems, DAGS 586-0518, Job No. 12-16-4250 |
10/23/03 2:00PM | |||||||||||
|
The work shall generally consist of new 1) A/C systems for existing classroooms, 2) including new acoustical tile ceilings, 3) equipment enclosures, 4) mechanical & electrical work, & 5) related misc. work. Estimated construction cost is between $250,000 - $500,000. Site work (selective demolition, earthwork), concrete (cast-in-place concrete), metals (misc. metal fabrications), wood & plastics (rough/finish carpentry, treated lumber), thermal & moisture protection (sealants), finishes (gypsum wallboard, acoustical ceiling, painting), special construction (lead-based paint control measures), mechanical (A/C), electrical (electrical work). | |||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Bonded Construction 832-0822 Fax 832-0826 Diversified Plumbing & A/C 845-1335 Fax 847-7864 FordAble Construction, LLC 676-9959 Fax 676-9618 Honolulu Shipyard, Inc 848-6422 Fax 848-6426 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
International Roofing & Bldg Const 456-2880 Fax 455-6722 Oceanic Companies, Inc 843-8300 Fax 843-2800 PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 Stan's Contracting, Inc 935-2566 Fax 935-0700 StarCom Builders Inc 952-6088 Fax 952-6588 Tek Pacific 454-1117 Fax 455-0900 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||
|
We are not responsible for errors or omissions. If you find any mistakes, please let me know at 808-331-1597 | |||||||||||||
|
Page Six | |||||||||||||
|
| |||||||||||||
|
O933 Kalanimoku Bldg |
Emergency Generator, DAGS 586-0518, Job No. 12-10-0228 |
10/23/03 2:00PM | |||||||||||
|
The work shall generally consist of 1) selective demolition/removal, 2) site work, 3) concrete, 4) stone masonry, 5) metal fabrications, 6) carpentry, 7) waterproofing, 8) steel doors/frames, 9) finish hardware, 10) acoustical panel treatment, 11) painting, 12) louvers, 13) signage, 14) hazardous materials removal/disposal/control measure, 15) mechanical/plumbing, 16) electrical/generator, etc. complete. The voluntary prebid meeting will be held at the Kalanimoku Bldg. Rm 426, Public Works Conference Rm, 1151 Punchbowl Street, Honolulu, HI. on Friday, Oct 3, 2003, at 9:00a.m. with a guided site visit after. $1-5 Million Estimated Cost | |||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Beachside Roofing 833-6607 Fax 682-0704 C C Engineering & Construction, Inc 848-2032 Fax 841-1807 Constructors Hawaii, Inc 848-2455 Fax 842-3509 FordAble Construction, LLC 676-9959 Fax 676-9618 T. Iida Contracting, Ltd 247-4241 Fax 235-1378 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
International Roofing & Bldg Const 456-2880 Fax 455-6722 KD Construction, Inc 847-0229 Fax 851-7311 Koga Engineering & Construction Inc 845-7829 Fax 842-9384 Oceanic Companies, Inc 843-8300 Fax 843-2800 PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 S & M Sakamoto, Inc 456-4717 Fax 456-7202 Stan's Contracting, Inc 935-2566 Fax 935-0700 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||
|
O940 Stevenson Middle School |
Playfield & Parking Lot Improvements, DAGS 586-0518, Job No. 12-16-4022 |
10/23/03 2:00PM | |||||||||||
|
Work includes resurfacing of parking areas, construction of new curbs, sidewalks, curb ramps, retaining walls, fencing, irrigation, & grassing of the ball field, & other incidental related work. Estimated construction cost is between $500,000 - $1,000,000. Site work (demolition & removal, clearing & grubbing, drainage, chain link fence & gates, asphaltic concrete paving, pavement marking, site utilities, landscape irrigation system, baseball field soil mixtures, lawns & grass), concrete (concrete formwork/reinforcement, cast-in-place concrete), metals (structural steel), wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (metal roofing), finishes (painting), electrical (basic electrical materials & methods). | |||||||||||||
|
Plan Holders of Record: Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Henry's Equipment Rental & Sales Inc 696-2879 Fax 696-7837 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 KD Construction, Inc 847-0229 Fax 851-7311 Kiewit Pacific Co 674-1088 Fax 674-1233 Koga Engineering & Construction Inc 845-7829 Fax 842-9384 Mega Construction, Inc 839-0022 Fax 839-7191 Oceanic Companies, Inc 843-8300 Fax 843-2800 |
Okada Trucking Co., Ltd 841-0138 Fax 847-4983 PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 RMY Construction, Inc 596-8003 Fax 596-8015 Road Builders Corporation 833-5400 Fax 833-1300 Rons Construction Corp 841-6151 Fax 842-1451 Royal Contracting Co., Ltd 839-9006 Fax 839-7571 Site Engineering Inc 841-8883 Fax 842-0320 Tek Pacific 454-1117 Fax 455-0900 | ||||||||||||
|
O941 Aiea Public Library |
Accessibility & Other Improvements, DAGS 586-0518, Job No. 12-36-6329 |
10/23/03 2:00PM | |||||||||||
|
Site work (demolition, soil treatment for vegetation control, chain link fence, lawns & grass, asphaltic concrete paving, paving, pavement marking), concrete (cast-in-place concrete), metals (metal fabrication), thermal & moisture protection (sealants), doors & windows (aluminum door frame, finish hardware, glazing), finishes (painting), specialties (identifying devices, toilet accessories), mechanical (plumbing), electrical (basic materials & methods), & other incidental related work. Estimated construction cost is between $50,000 - $100,000. | |||||||||||||
|
Plan Holders of Record: Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Colin & Dillon Construction 864-1207 Fax 626-9790 Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Henry's Equipment Rental & Sales Inc 696-2879 Fax 696-7837 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 Kokea Construction & Consultants Inc 842-4454 Fax 842-4455 |
MJ Construction Co 678-2621 Fax 676-0650 Oceanic Companies, Inc 843-8300 Fax 843-2800 Road Builders Corporation 833-5400 Fax 833-1300 Rons Construction Corp 841-6151 Fax 842-1451 Site Engineering Inc 841-8883 Fax 842-0320 Tek Pacific 454-1117 Fax 455-0900 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||
|
O944 Wheeler Elementary School |
Reroof Bldg A, DAGS 586-0518, Job No. 57-16-3585 |
10/23/03 2:00PM | |||||||||||
|
Work includes removal of existing built-up roofing system, including flashings & roof vents, installation of modified bitumen roofing system, installation of related items such as metal flashing, sheet metal flashings, etc., & other incidental related work. Estimated construction cost is between $100,000 - $250,000. | |||||||||||||
|
Plan Holders of Record: Alcal Hawaii Roofing 682-5222 Fax 682-5064 Beachside Roofing 833-6607 Fax 682-0704 Certified Construction, Inc 841-0957 Fax 848-0816 Commercial Roofing & Waterproofing HI, 841-7246 Fax 841-0053 |
Hi-Tec Roofing Inc 841-7663 Fax 845-3866 Moriyama Construction Inc 843-1954 Fax 843-1697 MRC, Inc 842-4464 Fax 847-6186 Tory's Roofing & Waterproofing, Inc 456-5990 Fax 455-1994 | ||||||||||||
|
Page Seven | |||||||||||||
|
| |||||||||||||
|
O942 Kainalu Elementary School |
Floor Tiles & Carpet, DAGS 586-0518, Job No. 59-16-5216 |
10/23/03 2:00PM | |||||||||||
|
Work includes removal of existing carpet & the installation of new carpet & vinyl composition tile, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. | |||||||||||||
|
Plan Holders of Record: Alii Flooring, Inc 487-5535 Fax 486-8840 |
Fine Flooring Products 841-2884 Fax 841-2886 Society Contracting LLC 455-8157 Fax 455-1403 | ||||||||||||
|
O943 Juvenile Detention Home Facility |
Roofing & Other Improvements, DAGS 586-0518, Job No. 12-21-7128 |
10/23/03 2:00PM | |||||||||||
|
Work includes removal of existing roofing & flashing, installation of new roofing & flashing, installation of new roof drains, replacement & repair of termite damaged wood members, termite treatment, plaster repair & painting, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (demolition, treatment for termite control), wood & plastics (rough/finish carpentry, preservative treated lumber), thermal & moisture protection (cementitious waterproofing, TPO fully adhered roof system, sheet metal flashing & trim, manufactured roof specialties, sealants & caulking), finishes (plaster repairs, gypsum wallboard systems, resilient tile floor, interior & exterior repainting), special construction (removal & disposal of asbestos-containing materials), electrical (electrical). | |||||||||||||
|
Plan Holders of Record: Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Beachside Roofing 833-6607 Fax 682-0704 Certified Construction, Inc 841-0957 Fax 848-0816 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
MJ Construction Co 678-2621 Fax 676-0650 Oceanic Companies, Inc 843-8300 Fax 843-2800 PER, Inc 842-7850 Fax 842-7705 Stan's Contracting, Inc 935-2566 Fax 935-0700 StarCom Builders Inc 952-6088 Fax 952-6588 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||
|
O945 Kaonohi Wells I & Booster No. $1,400,000 Estimated Cost |
Renovation, C of H 523-4682 Fax 423-4847, Job No. 03-071, Project Engineer: Ken Sakamoto @ 748-5832 |
10/23/03 2:00PM | |||||||||||
|
Work includes the renovation of Kaonohi Wells I & Booster No. 1 Station including demolition work, construction of temporary enclosure, repair to existing structures, painting, removal & disposal of hazardous materials, replacement of mechanical equipment including plumbing fixtures, chlorination system, gages & instrumentation; installation of temporary exhaust fan systems & appurtenances, removal of pump control valves, replacement of existing electrical equipment including motor control centers & gageboards, building electrical renovation including temporary electrical work, & other incidental related work. | |||||||||||||
|
Plan Holders of Record: Abhe & Svoboda, Inc 682-4833 Fax 682-0780 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 KD Construction, Inc 847-0229 Fax 851-7311 KSC Painting & Construction 842-3666 Fax 842-4191 |
Mega Construction, Inc 839-0022 Fax 839-7191 Oceanic Companies, Inc 843-8300 Fax 843-2800 Okada Trucking Co., Ltd 841-0138 Fax 847-4983 Robison Construction Inc 838-1360 Fax 838-7639 Rons Construction Corp 841-6151 Fax 842-1451 Site Engineering Inc 841-8883 Fax 842-0320 | ||||||||||||
|
O955 Waiahole Elementary School |
Bldg D - A/C System, DAGS 586-0518, Job No. 12-16-4247 |
10/23/03 2:00PM | |||||||||||
|
Site work (removal work, earthwork for structures), concrete (cast-in-place concrete), masonry (concrete unit masonry), wood & plastics (carpentry & related work, preservative treated lumber), thermal & moisture protection (mineral fiber blanket insulation, modified bitumen sheet roofing-hot-moped, flashing & sheet metal, sealants), doors & windows (fiberglass reinforced polyester (FRP) plastic doors, aluminum jalousie windows, finish hardware), finishes (painting), specialties (metal wall louvers), mechanical (A/C & ventilation), electrical (electrical work), & other incidental related work. Estimated construction cost is between $100,000 - $250,000. | |||||||||||||
|
Plan Holders of Record: Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Beachside Roofing 833-6607 Fax 682-0704 Colin & Dillon Construction 864-1207 Fax 626-9790 Honolulu Shipyard, Inc 848-6422 Fax 848-6426 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
MJ Construction Co 678-2621 Fax 676-0650 Oceanic Companies, Inc 843-8300 Fax 843-2800 PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 StarCom Builders Inc 952-6088 Fax 952-6588 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||
|
O948 Hale Kula Elementary School |
Reroof Bldg C, DAGS 586-0518, Job No. 57-16-3552 |
10/23/03 2:00PM | |||||||||||
|
Work includes removal of existing built-up roofing system, including flashings, sheet metal leaders & gutters, installation of modified bitumen roofing system with rigid insulation, installation of gutter, sheet leaders & downspouts, & reinstallation of existing gutter, & other incidental related work. Site work (selective demolition & removal), wood & plastics (rough carpentry, preservative treated lumber) thermal & moisture protection (modified bitumen sheet roofing-hot-moped, flashing & sheet metal, sealants), finishes (painting). | |||||||||||||
|
Plan Holders of Record: Beachside Roofing 833-6607 Fax 682-0704 Certified Construction, Inc 841-0957 Fax 848-0816 Commercial Roofing & Waterproofing HI, 841-7246 Fax 841-0053 |
Moriyama Construction Inc 843-1954 Fax 843-1697 MRC, Inc 842-4464 Fax 847-6186 Tory's Roofing & Waterproofing, Inc 456-5990 Fax 455-1994 | ||||||||||||
|
Page Eight | |||||||||||||
|
| |||||||||||||
|
O949 Ke'elikolani Bldg |
Renovation of Room 209 Entrance Area for DLIR, DAGS 586-0518, Job No. 12-10-0320 |
10/23/03 2:00PM | |||||||||||
|
Work includes minor demolition including adhesive mastic containing asbestos, construction of new walls, installation of doors, installation of electric card key locks on doors, painting, resilient flooring, electrical & A/C changes & installation of pass-thru windows, & other incidental related work. Estimated construction cost is between $50,000 - $100,000. Site work (selective demolition), doors & windows (steel door frames, wood doors, finish hardware), finishes (gypsum wallboard, acoustical tiles, resilient tile floor, painting), specialties (signage), special construction (removal & disposal of asbestos-containing material, testing/air monitoring), mechanical (A/C & ventilation), electrical (basic electrical materials & methods). | |||||||||||||
|
Plan Holders of Record: Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
Kokea Construction & Consultants Inc 842-4454 Fax 842-4455 Oceanic Companies, Inc 843-8300 Fax 843-2800 StarCom Builders Inc 952-6088 Fax 952-6588 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||
|
O951 City of Kapolei $360,000 Estimated Cost |
Recycled Water System Improvements, C of H 523-4682 Fax 423-4847, Job No. 03-101, Project Engineer: JoAnn Yasuda @ 748-5722 |
10/23/03 2:00PM | |||||||||||
|
Work includes the installation of approximately 1,000 linear feet of 16-inch recycled water mains & appurtenances along the future Kamokila Blvd. extension from Kapolei Parkway to the future Renton Road, as shown on the construction plans, & other incidental related work. | |||||||||||||
|
Plan Holders of Record: Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Mega Construction, Inc 839-0022 Fax 839-7191 Okada Trucking Co., Ltd 841-0138 Fax 847-4983 |
Preferred Constructors, Inc 293-8085 Fax 293-1469 RMY Construction, Inc 596-8003 Fax 596-8015 Rons Construction Corp 841-6151 Fax 842-1451 | ||||||||||||
|
O952 Kalihi Water System $900,000 Estimated Cost |
Improvements - Part II, Phase A, C of H 523-4682 Fax 423-4847, Job No. 03-033A, Project Engineer: Gregory Shiu @ 748-5751 |
10/23/03 2:00PM | |||||||||||
|
Work includes the installation of approximately 2,000 linear feet of 8-inch recycled water mains & appurtenances along Mokauea Street from Dillingham Blvd. to North King Street, & other incidental related work. A prebid conference will be held at 9:30 a.m. on Oct 7, 2003 in the Engineering Bldg., Inspectors Conference Room of the Board of Water Supply, 630 South Beretania Street, Honolulu. Potential bidders, offerors, subcontractors & union representatives who are interested in attending the prebid conference should contact Gregory Shiu at 748-5751. | |||||||||||||
|
Plan Holders of Record: Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Hawaii Waters Tech, Ltd 486-1400 Fax 486-1726 Koga Engineering & Construction Inc 845-7829 Fax 842-9384 Mega Construction, Inc 839-0022 Fax 839-7191 |
Okada Trucking Co., Ltd 841-0138 Fax 847-4983 Preferred Constructors, Inc 293-8085 Fax 293-1469 RMY Construction, Inc 596-8003 Fax 596-8015 Rons Construction Corp 841-6151 Fax 842-1451 | ||||||||||||
|
O953 Aiea Heights $2,600,000 Estimated Cost |
Water System Improvements - Part I, C of H 523-4682 Fax 423-4847, Job No. 03-066J, Project Engineer: Lester Fujikami @ 748-5713 |
10/23/03 2:00PM | |||||||||||
|
Work includes the installation of approximately 8,100 linear feet of 12-inch & 4-inch water mains & appurtenances along Aiea Heights Drive, Wiliko Street, Lalani Street, Olopana Street, Majiko Place, Ulune Street, Anounou Place, Kaulainahee Place, Poaha Place, & Uwau Drive, & other incidental related work. A prebid conference will be held at 2:00 a.m. on Oct 8, 2003 in the Engineering Bldg., Inspectors Conference Room of the Board of Water Supply, 630 South Beretania Street, Honolulu. Potential bidders, offerors, subcontractors & union representatives who are interested in attending the prebid conference should contact Lester Fujikami at 748-5713. | |||||||||||||
|
O954 Oahu $550,000 Estimated Cost |
Ka Hanahou Place, Lilipuna Place & Springer Place: 8-Inch Water Mains, C of H 523-4682 Fax 423-4847, Job No. 03-025, Project Engineer: Ryan Nakata @ 748-5718 |
10/23/03 2:00PM | |||||||||||
|
Work includes the installation of approximately 2,600 linear feet of 8-inch water mains & appurtenances along Ka Hanahou Place, Lilipuna Place, Springer Place & Mololani Place, & other incidental related work. A prebid conference will be held at 2:00 a.m. on Oct 8, 2003 in the Engineering Bldg., Inspectors Conference Room of the Board of Water Supply, 630 South Beretania Street, Honolulu. Potential bidders, offerors, subcontractors & union representatives who are interested in attending the prebid conference should contact at Ryan Nakata 748-5718. | |||||||||||||
|
O956 Kamamalu Bldg |
Partial Reroof, DAGS 586-0518, Job No. 62-10-0173 |
10/23/03 2:00PM | |||||||||||
|
Site work (selective demolition & removal), wood & plastics (rouch carpentry, preservative treated lumber), thermal & moisture protection (elastomeric sheet roofin-single ply, roof scuttle, sealants), finishes (painting), & other incidental related work. Estimated construction cost is between $50,000 - $100,000. | |||||||||||||
|
Page Nine | |||||||||||||||||||||
|
| |||||||||||||||||||||
|
O957 Schofield Barracks |
Construct Duel Food Facility, Amd #1, Army & Air Force Exchange Services (AAFES), 3911 South Walton Walker Blvd, Dallas, TX 75236, Contact: Linda Tavano 214-312-6980 Fax 214-312-6297, SOL No. AAFES-REZC93-035-03-057 |
10/23/03 2:00PM | |||||||||||||||||||
|
The project consists of construction of an 8,823 sf Duel Food Facility with Popeye's Chicken & Burger King Restaurant. In addition a children playground is included in this project. Site work (soil engineering reports, demolition, soil treatment for termite control, earthwork, chain link fence & gates, concrete sidewalks & curbs, asphalt concrete paving, piped utilities, storm drain, irrigation, soil preparation, lawns/grasses & windflowers, trees/plants & ground covers), concrete (cast-in-place concrete), masonry (unit masonry), metals (structural steel, steel joists, steel deck, cold-formed metal framing, metal fabrications), carpentry (rough carpentry, custom casework), thermal & moisture protection (building insulation, exterior insulation finished system (EIFS), firestopping, manufactured rood panels, single-ply membrane roofing, flashing & sheet metal, roof accessories, joint sealants), doors & windows (pressed steel doors & frames, wood/access doors, aluminum entrances & storefronts, pass-thru windows, finish hardware, glass & glazing), finishes (metal stud system, gypsum drywall, Portland cement board, ceramic floor tile, ceramic wall tile, quarry tile, suspended acoustical lay-in ceilings, rubber panels, resilient sheet flooring, painting, vinyl wall coverings, RFP panels) specialties (restroom partitions, bulletin boards, metal lockers, fire extinguishers/cabinets & accessories, restroom accessories, misc.. specialties), equipment (AAFES-furnished, contractor-installed equipment & furnishings, AAFES-furnished & installed equipment & furnishings, installation of food equipment), mechanical (testing piping systems, mechanical identification, insulation, plumbing, plumbing fixtures & trim, refrigerant piping & specialties, rooftop heat pump units, metal ducts, duct accessories, power ventilators, diffusers/registers & grills, air filters, testing/adjusting & balancing of HVAC systems), electrical (raceways, underground duct bank, wires & cable, medium voltage cable, boxes, wiring devices, grounding & bonding, electrical identification, pad mounted distribution transformers, overhead line materials, service & distribution, fuses, motor control, lighting, site lighting, fire alarm systems, telephone service, raceways & wiring, electrical sensing & measurement, lighting control, testing). Estimated construction cost is between $2,500,000 & $5,000,000. | |||||||||||||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
LYZ Inc 845-3779 Fax 845-3748 Oceanic Companies, Inc 843-8300 Fax 843-2800 | ||||||||||||||||||||
|
O958 Oahu |
ADA Accessibility Compliance for Eleven (11) State Housing Projects - Group A, HCDCH 587-0530/0535 Fax 587-0600/0588, Project No. 01-027-000-S(A) |
10/29/03 2:00PM | |||||||||||||||||||
|
Site work (selective demolition, earthwork, soil treatment for vegetation control, concrete pavement, walkways & pads, asphalt concrete paving, pavement markings, traffic signage & handrails), concrete (concrete formwork/reinforcement, cast-in-place concrete), masonry (concrete unit masonry), metals (misc. metals), wood & plastics (rough/finish carpentry, preservative treated lumber), thermal & moisture protection (waterproofing membrane, flashing & sheet metal, sealants & caulking), doors & windows (finish hardware), finishes (gypsum board, ceramic tile, resilient flooring, interior/exterior painting), conveying systems (passenger elevator), mechanical (plumbing, ventilation), electrical (basic electrical materials & methods, fire alarm & detection systems, telephone entry system), & other incidental related work. | |||||||||||||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 |
T. Iida Contracting, Ltd 247-4241 Fax 235-1378 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||||||||||
|
O959 Oahu |
ADA Accessibility Compliance for Seven (7) State Housing Projects - Group A, HCDCH 587-0530/0535 Fax 587-0600/0588, Project No. 01-027-000-S(B) |
10/29/03 2:00PM | |||||||||||||||||||
|
Site work (selective demolition, earthwork, soil treatment for vegetation control, concrete pavement, walkways & pads, asphalt concrete paving, pavement markings, traffic signage & handrails), concrete (concrete formwork/reinforcement, cast-in-place concrete), masonry (concrete unit masonry), metals (misc. metals), wood & plastics (rough/finish carpentry, preservative treated lumber), thermal & moisture protection (waterproofing membrane, flashing & sheet metal, sealants & caulking), doors & windows (finish hardware), finishes (gypsum board, ceramic tile, resilient flooring, interior/exterior painting), conveying systems (passenger elevator), mechanical (plumbing, ventilation), electrical (basic electrical materials & methods, fire alarm & detection systems, telephone entry system), & other incidental related work. | |||||||||||||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 |
T. Iida Contracting, Ltd 247-4241 Fax 235-1378 Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||||||||||
|
*O970 Honolulu District Court Bldg |
Judiciary Information Management Systems (JIMS) Office & Training Space/District Court Fiscal & Storage Space - Interior Alterations & Improvements Judiciary Job No. J04145, Fax 808-538-5802 |
10/29/03 2:00PM | |||||||||||||||||||
|
The work shall be performed at the Honolulu District Court Bldg., Kauikeaouli Hale, 1111 Alakea Street, 9th Floor, & shall generally consist of interior alterations & improvements to include: removing existing carpet, pad & base; removing existing door & frame & stud partition wall, constructing new partition walls, door frame, & wall & base cabinets; removing existing A/C ducts; installing new fan coil units, ducts, painting, electrical, mechanical, & related work, completed. Estimated construction cost is between $150,000 - $200,000. A written notice of intention to bid must be received by the above office no later than 2:00 P.M. on the 10th calendar day prior to the opening of the bids. | |||||||||||||||||||||
|
Page Ten | ||||||||||||||
|
| ||||||||||||||
|
O961 Police Training Academy $5,467,761 Estimated Cost |
Indoor Firing Range, C of H 523-4682 Fax 423-4847, Project No. IX-20-03-C, Project Engineer: Curtis Kushimaejo @ 527-6332 |
10/30/03 2:00PM | ||||||||||||
|
Site work (site preparation, clearing, earthwork, engineered fill, basaltic termite barrier, soil treatment for vegetation control, prestressed concrete piles, termite control, chain link fence & gates, traffic signs, asphaltic concrete pavement, concrete curbs/gutters & walks, pavement markings, drainage system, water system, sanitary sewage system, underground irrigation system, landscape work), concrete (concrete formwork/reinforcing, cast-in-place concrete structural precast concrete, precast concrete specialties, concrete repair), masonry (unit masonry, reinforced unit masonry), metals (fasteners & anchors, structural steel joists & joist girders, steel deck, metal fabrications, handrails & railings), wood & plastics (wood treatment, rough/finish carpentry, architectural woodwork), thermal & moisture protection (sheet membrane waterproofing, building insulation, exterior finish systems, rigid acoustical insulation board, membrane roofing, flashing & sheet metal, roof specialties, firestopping, joint sealers), doors & windows (steel doors/frames, access doors/panels, special function doors, steel acoustical/bullet resistant door assemblies, steel acoustical window assemblies, hardware, glazing, glazed metal framing systems), finishes (metal support assemblies, gypsum board, tile, acoustical ceilings, resilient flooring, acoustical wall finishes, special wall surfaces, paints & coatings), specialties (phenolic toilet compartments, steel lockers, fire protection specialties, toilet accessories), firing range equipment (modular bullet trap, shooting range baffles, turning target actuator, track mounted running target), mechanical (plumbing, fire protection systems, A/C & ventilation), electrical (underground electrical, lighting, parabolic louver, fire alarm & detection systems, telecommunications systems), electronic & data systems (range safety wireless communication system, paging system), & other incidental related work. | ||||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 T. Iida Contracting, Ltd 247-4241 Fax 235-1378 |
Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 Okada Trucking Co., Ltd 841-0138 Fax 847-4983 Projects Plus, Inc 839-0044 Fax 833-1287 | |||||||||||||
|
O960 Oahu $1,327,000 Estimated Cost |
Maunawili Road & Maunawili Loop: 8-Inch Water Main, C of H 523-4682 Fax 423-4847, Job No. 03-030, Project Engineer: Gayson Ching @ 748-5718 |
10/30/03 2:00PM | ||||||||||||
|
Work includes the installation of approximately 6,000 linear feet of 8-inch water main & appurtenances, inclusive of external corrosion control along Maunawili Road & Maunawili Loop, & other incidental related work. A prebid conference will be held at 2:00 a.m. on Oct 8, 2003 in the Engineering Bldg., Inspectors Conference Room of the Board of Water Supply, 630 South Beretania Street, Honolulu. Potential bidders, offerors, subcontractors & union representatives who are interested in attending the prebid conference should contact Gayson Ching or Ryan Nakata at 748-5712 or 748-5718 | ||||||||||||||
|
Plan Holders of Record: Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Hawaii Waters Tech, Ltd 486-1400 Fax 486-1726 Mega Construction, Inc 839-0022 Fax 839-7191 Okada Trucking Co., Ltd 841-0138 Fax 847-4983 |
Preferred Constructors, Inc 293-8085 Fax 293-1469 RMY Construction, Inc 596-8003 Fax 596-8015 Robison Construction Inc 838-1360 Fax 838-7639 Rons Construction Corp 841-6151 Fax 842-1451 | |||||||||||||
|
O947 Kamauleule Bldg |
Bio-Safety Lab Renovation & Other Improvements, DAGS 586-0518, Job No. 12-20-2562 |
10/30/03 2:00PM | ||||||||||||
|
Site work (demolition, removal & relocation, clearing, earthwork, soil treatment for termite/vegetation control, landscape irrigation systems, drilled shafts, asphalt concrete paving, Portland cement concrete paving, piped utility materials & methods, warning tape & detection wire, lawns & grass), concrete (cast-in-place concrete), masonry (unit masonry assemblies), metals (structural steel, metal decking/fabrications), wood & plastics (carpentry & related work, preservative treated lumber), thermal & moisture protection (exterior finish system, preformed metal roof & wall panels, modified bitumen sheet roofing-hot mopped, flashing & sheet metal, sealants), doors & windows (steel doors/frames, aluminum door & frame, access doors, automatic sliding doors, aluminum windows, finish hardware, glazing), finishes (gypsum board, ceramic tile, resilient tile floor, resilient sheet flooring, painting), specialties (identifying devices, misc. specialties), equipment (laboratory equipment), furnishings (laboratory casework & countertops), mechanical (wet pipe sprinkler system, plumbing, chilled water piping & accessories, a/C & ventilation, direct digital control system), electrical (basic electrical materials & methods), & other incidental related work. | ||||||||||||||
|
Plan Holders of Record: Allied Construction, Inc 841-0177 Fax 847-1402 Walter Y. Arakaki G.C., Inc 841-3327 Fax 842-7682/847-0582 BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 C C Engineering & Construction, Inc 848-2032 Fax 841-1807 Ching Construction 842-1844 Fax 841-7138 Constructors Hawaii, Inc 848-2455 Fax 842-3509 FordAble Construction, LLC 676-9959 Fax 676-9618 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 International Roofing & Bldg Const 456-2880 Fax 455-6722 KD Construction, Inc 847-0229 Fax 851-7311 |
Koga Engineering & Construction Inc 845-7829 Fax 842-9384 KSC Painting & Construction 842-3666 Fax 842-4191 MJ Construction Co 678-2621 Fax 676-0650 Oceanic Companies, Inc 843-8300 Fax 843-2800 PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 Rons Construction Corp 841-6151 Fax 842-1451 S & M Sakamoto, Inc 456-4717 Fax 456-7202 Stan's Contracting, Inc 935-2566 Fax 935-0700 Tek Pacific 454-1117 Fax 455-0900 Universal Construction, Inc 845-3986 Fax 842-3881 | |||||||||||||
|
There will be a password required soon. Without the password you won't be able to access the website. Contact Barron at 808-331-1597. | ||||||||||||||
|
Page Eleven | ||||||||||||
|
| ||||||||||||
|
O963 Kaewai Elementary School |
Stabilize Various Bldgs & Renovate & Paint Classrooms, DAGS 586-0518, Job No. 52-16-5258 |
10/30/03 2:00PM | ||||||||||
|
Site work (selective demolition, site preparation, earthwork-grading, excavation, trenching & backfilling for utility systems, standard resistance pier system, soil erosion control, soil treatment for termite control, drainage, lawns & grass, urethane injection grouting), concrete (cast-in-place concrete, concrete & masonry repairs), masonry (unit masonry assemblies), metals (structural steel), wood & plastics (rough/finish carpentry, treated lumber), thermal & moisture protection (flashing & sheet metal, sealants), doors & windows (wood doors, fiberglass reinforced polyester (FRP) doors & frames, aluminum jalousie windows, finish hardware, glazing), finishes (gypsum board, ceramic tile, acoustical ceiling, resilient flooring, carpeting-direct glue down, painting), specialties (whiteboards & tackboards, metal security screens, metal storage cabinets, toilet accessories), furnishings (horizontal blinds), special construction (removal & disposal of asbestos-containing material, removal & disposal of lead-containing paint, lead-based paint control measures, testing & air monitoring, fire alarm system), mechanical (plumbing system, plumbing fixtures & trim), electrical (basic materials & methods, lighting), & other incidental related work. Estimated construction cost is between $1,000,000 - $5,000,000. | ||||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Constructors Hawaii, Inc 848-2455 Fax 842-3509 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 KD Construction, Inc 847-0229 Fax 851-7311 KSC Painting & Construction 842-3666 Fax 842-4191 MJ Construction Co 678-2621 Fax 676-0650 Oceanic Companies, Inc 843-8300 Fax 843-2800 |
PER, Inc 842-7850 Fax 842-7705 Projects Plus, Inc 839-0044 Fax 833-1287 S & M Sakamoto, Inc 456-4717 Fax 456-7202 Society Contracting LLC 455-8157 Fax 455-1403 Structural Systems Inc 845-2474 Fax 847-2966 Universal Construction, Inc 845-3986 Fax 842-3881 Western Engineering, Ltd 671-6715 Fax 676-8577 | |||||||||||
|
O962 Oahu $2,900,000 Estimated Cost |
Rehabilitation of Street, Unit 30, C of H 523-4682 Fax 423-4847, Project No. 33-03, Project Engineer: Charmaine Tadjvar @ 547-7192 |
10/30/03 2:00PM | ||||||||||
|
The project is for the resurfacing of a portion of Haiku Road, Kam Hwy to Kahuhipa Street; Heeia Street, Haiku Road to Kam Hwy; Alaloa Street, Kahuhipa Hwy to Ahuimanu Road. Work includes cold planing, resurfacing of asphalt concrete pavements, reconstruction of weakened pavement, adjustment of utility manhole frames & covers, vehicle loop detectors, & installation of pavement markings, & other incidental related work. A prebid conference will be held at 2:00 a.m. on Oct 13, 2003 at the Honolulu Municipal Bldg, 9th Floor Conference Room, 650 South King Street, Honolulu. | ||||||||||||
|
Plan Holders of Record: Jas. W. Glover, Ltd 935-0871 Fax 961-9237 Grace Pacific Corporation 845-3991 Fax 842-3203 Hawaiian Dredging Construction Co 734-3211 Fax 734-3232 Kiewit Pacific Co 674-1088 Fax 674-1233 |
RMY Construction, Inc 596-8003 Fax 596-8015 Road Builders Corporation 833-5400 Fax 833-1300 Rons Construction Corp 841-6151 Fax 842-1451 Royal Contracting Co., Ltd 839-9006 Fax 839-7571 | |||||||||||
|
O935 Various Locations on Oahu |
Provide Contract Support Services for the Navy Public Works Center Pearl Harbor & its Customers, Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Division, Pacific, Acquisition Dept., 258 Makalapa Drive, Suite 100, Pearl Harbor, HI 96860-3134, SOL No. N62742-02-R-1109, Original Point of Contact: Jill Nii 474-2038 Fax 471-5881, Amd #1-3, email pacdiva76@efdpac.navfac.navy.mil |
10/30/03 2:00PM | ||||||||||
|
This solicitation is issued on an Unrestricted Basis. NAICS Code is 541990 (previously SIC code 7389). The Pacific Division, Naval Facilities Engineering Command, Acquisition Department (ACQ0252), intends to issue a solicitation for an OMB Circular A-76 Cost Comparison Study for work currently being provided by the Navy Public Works Center, Pearl Harbor, HI. This acquisition will comply with the procedures prescribed in Office of Management & Budget Circular No. A-76, the Commercials Activities (CA) program. This A-76 cost comparison study will examine the possibility of converting Government in-house operations to contractor operations. This solicitation may result in the award of a combination Firm Fixed-Price (FFP) & Indefinite Quantity (IQ) type contract. The applicable size standard is $6 million. The period of performance includes a 12-month base period with 4 options to extend the term for a total period not to exceed 60 months. The Government may make an award based on initial proposals without conducting discussions if the Contracting Officer determines discussions are not necessary. If the contractor is the successful service provider as a result of the cost comparison, the estimated date of contract award is April 2004 with full performance starting July 2004. Following the selection of a Best Value contractor, a cost comparison to determine the feasibility & economy of converting the work currently performed by Government personnel to contract performance will be conducted. A contract will not be awarded unless the costs of contracting are lower than costs of continued Government performance by a minimum cost differential of the lesser of 10% of in-house personnel-related costs or $10 million over the performance period. Government personnel adversely affected by conversion of government-performed services to contract have the Right of First Refusal for jobs for which they are qualified. The services to be performed include: 1) Pre-Award Contract Requirements, 2) Post-Award Contracts Requirements, & 3) Quality Assurance Evaluation (QAE). Pre-Award Contract Requirements include development of Quality Assurance Surveillance Plans (QASP); Statements of Work( formal, BPAs, SAPs); Drawings; Project Estimates; Attendance at Customer Meetings; In-House Technical Meetings; Pre-Proposal Site Visits; & Pre-proposal Conference/Meetings. Post Award Contract Requirements include Preparation of Statements of Work, Drawings, Project Estimates Negotiation Assistance, Attendance at Contractor Meetings, & Site Visits with Contractors. Quality Assurance Evaluation includes Attendance at Solicitation Site Visits, Meetings, Review of Contractor Quality Control Plans, Submittals, Inspection Schedules, Prepare Surveillance Schedules, QA Audit Schedules, Monthly Evaluation Reports, Contractor Discrepancy Reports, Perform Surveillance, Verify Contractor Invoices, Monitor Labor, Safety & Security practices, & Conduct Labor Interviews. | ||||||||||||
|
Page Twelve | |||||||||||||||||
|
| |||||||||||||||||
|
Plan Holders of Record: 2rw Consultants Inc 434-296-2116 Antares Information Systems Inc 619-758-1751 Fax 619-658-1743 Gonzales Construction 818-758-2490 Fax 818-996-3955 B2C Inc 703-416-1032 Fax 703-416-1033 BMAR & Associates Inc 270-885-4675 Fax 270-707-4901 Basile Baumann Prost & Assoc 410-266-7800 Fax 410-266-7866 C&S Global Inc702-419-2544 Fax 702-616-1614 Cooper Zietz Engineers Inc 360-666-0055 Fax 360-666-4827 Covenant Industries Inc 626-581-9880 Fax 626-581-9990 Envirosmart Inc 843-762-7755 Fax 843-762-7763 Greenfield & Associates Inc 303-292-0416 Fax 303-292-0426 HPM Corporation 509-943-8484 Fax 509-043-8464 Hawaii International Environmental Services Inc 808-263-4787 Fax 808-263-0860 IECM Inc 808-688-2501 Fax 808-688-2501 J.A. Jones Management Services Inc 704-553-6610 Fx 704-553-6687 Jerry Ballard & Assoc 334-727-8860 Fax 334-727-8160 Kaneohe General Service Inc 808-456-9292 Fax 808-454-1367 Kira Inc 559-469-3559 Fax 559-998-9745 Kellogg Brown & Root 703-526-7583 Fax 703-526-7585 |
ManTech Tele & Infor Systems Corp 808-485-2227 Fax 485-2228 Mandax Inc 603-362-5683 Fax 603-362-6418 McKenna Enterprises 561-626-0064 Fax 561-775-8707 Mele Associates Inc 808-396-4432 240-453-6991 NAVFAC PWFSO 619-571-4257 (Government) Naval Facilities Engineering Command 474-4256 Fax 471-4391 Navy Public Works Center 471-1021 (Government) Nick's Flooring & Maintenance Svcs 512-385-1515 Pacific Coast Sheet Metal Inc 805-677-4949 Fax 805-650-9865 Planned Systems International Inc 808-595-4635 PWC Washington 202-685-8137 Quality Surveillance Corp 770-254-9575 Fax 770-304-0020 San Juan Construction Inc 970-249-9696 Fax 970-249-2651 Shaw Environ & Infrasture Inc 619-446-4509 Fax 619-239-1616 Soil & Land Use Technology Inc 808-833-6155 Fax 808-833-6156 TG Associates CPAs PLLC 518-459-6700 Fax518-459-8492 The Ascher Group 303-683-1994 Fax 720-554-7988 The Cube Corp 703-481-9101x110 Fax 703-481-9193 Unity Inc 808-623-7163 Washington Group Inter Inc 703-629-8594 Fax 703-236-1932 | ||||||||||||||||
|
*O965 Mililani High School |
Reroof Bldg E, DAGS 586-0518, Job No. 57-16-3565 |
10/30/03 2:00PM | |||||||||||||||
|
Work includes removal of existing built-up roofing system including flashings, downspout, & roof/overflow drain strainer, installation of single ply roofing system, installation of related items as metal flashings, downspout, roof/overflow drain strainer, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (selective demolition), metal (metal fabrications), wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (elastomeric sheet roofing (single-ply), flashing & sheet metal, roof scuttle, sealants), finishes (painting). | |||||||||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Beachside Roofing 833-6607 Fax 682-0704 Certified Construction, Inc 841-0957 Fax 848-0816 |
Commercial Roofing & Waterproofing HI, 841-7246 Fax 841-0053 MRC, Inc 842-4464 Fax 847-6186 Projects Plus, Inc 839-0044 Fax 833-1287 Tory's Roofing & Waterproofing, Inc 456-5990 Fax 455-1994 | ||||||||||||||||
|
*O964 Makalapa Elementary School |
Reroof Bldgs I & K, DAGS 586-0518, Job No. 57-16-3564 |
10/30/03 2:00PM | |||||||||||||||
|
Work includes removal of existing built-up roofing system including but not limited to insulation, flashings & sealants, installation of single-ply roofing system over recovery board, installation of related items such as metal flashings, sealants, drain cover, etc., & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (selective demolition), metal (metal fabrications), wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (elastomeric sheet roofing (single-ply), flashing & sheet metal, roof scuttle, sealants), finishes (painting). | |||||||||||||||||
|
*O966 Solomon Elementary School |
Reroof Bldg E, DAGS 586-0518, Job No. 57-16-3579 |
10/30/03 2:00PM | |||||||||||||||
|
Work includes removal of existing gravel built-up roofing system including but not limited to flashings, roof relief vents, scuttle & sealants, installation of modified bitumen roofing system over tapered insulation, & installation of related items such as metal flashings, sealants, scuttle, drain strainer, etc., & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (selective demolition), metal (metal fabrications), wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (modified bitumen sheet roofing-hot mopped, flashing & sheet metal, roof scuttle, sealants), finishes (painting). | |||||||||||||||||
|
Plan Holders of Record: Certified Construction, Inc 841-0957 Fax 848-0816 |
Commercial Roofing & Waterproofing HI, 841-7246 Fax 841-0053 | ||||||||||||||||
|
*O967 919 Ala Moana Bldg |
Renovations to Rooms 110 & 117, DAGS 586-0518, Job No. 57-16-3579 |
10/30/03 2:00PM | |||||||||||||||
|
Site work (selective demolition), wood & plastics (finish carpentry), doors & windows (steel door frames, wood doors, finish hardware), finishes (gypsum wallboard, acoustical tile, carpeting-direct flue down, painting), mechanical (A/C & ventilation), & other incidental related work. Estimated construction cost is between $50,000 - $100,000. | |||||||||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 |
Universal Construction, Inc 845-3986 Fax 842-3881 | ||||||||||||||||
|
| |||||||||||||||||
|
Page Thirteen | ||||||||||||
|
| ||||||||||||
|
*O971 Kapuaiwa Bldg |
Interior Alterations & Improvements, DAGS 586-0518, Job No. 12-21-7127 |
10/30/03 2:00PM | ||||||||||
|
The work shall generally consist of: 1) selective removal work, 2) carpentry work, 3) cabinet & case work, 4) doors, 5) architectural finishes, 6) building specialties, 7) office furniture, 9) plumbing, 10) A/C & vents, 11) electrical work, 12) incidental work. Estimated construction cost is between $250,000 - $500,000. | ||||||||||||
|
*O968 Lanakila Senior Center |
Health, Safety & Accessibility Improvements, DAGS 586-0518, Job No. 12-20-2569 |
11/06/03 2:00PM | ||||||||||
|
Work includes renovation of an existing toilet room into an accessible unisex toilet room, gutter & downspout replacement, construction of a new wood stage, removal of existing vinyl asbestos floor tile, repair doorway thresholds, construction of concrete curbs & railings, mechanical, plumbing, electrical work, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (removal work), concrete (grout, concrete resurfacing), wood & plastics (rough/finish carpentry, preservative treated lumber), thermal & moisture protection (sheet metal flashing & trim, sealants & caulking), doors & windows (finish hardware), finishes (resilient tile floor, interior & exterior painting), specialties (toilet & bath accessories), special construction (abatement of asbestos-containing materials, disturbance & disposal of PCBs, testing/air monitoring), mechanical (plumbing), electrical (electrical general requirements). | ||||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 Diversified Plumbing & A/C 845-1335 Fax 847-7864 Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 |
StarCom Builders Inc 952-6088 Fax 952-6588 Tek Pacific 454-1117 Fax 455-0900 Universal Construction, Inc 845-3986 Fax 842-3881 | |||||||||||
|
*O972 Kaneohe Elementary School |
Administration Bldg Expansion & Renovation, DAGS 586-0518, Job No. 12-16-4039 |
11/06/03 2:00PM | ||||||||||
|
Work includes the construction of a new administration building & renovation of existing administration space to include site work (site demolition, selective demolition, site preparation, earthwork, termite control, soil treatment for vegetation control, landscape irrigation system, chain link fence, traffic signs, landscaping, lawns & grass asphaltic concrete pavement, concrete curbs & walks, pavement markings, water system, drainage, sanitary sewer system), concrete (cast-in-place concrete), masonry (unit masonry assemblies), metals (structural steel, metal decking, cold-formed metal framing, metal fabrications), wood & plastics (finish carpentry, treated lumber), thermal & moisture protection (building insulation, spray-applied glass fiber insulation, exterior finish system, preformed metal standing seam roofing, flashing & sheet metal, sealants), doors & windows (steel doors/frames, wood doors, aluminum sliding glass mall doors, PVC windows, finish hardware, glazing), finishes (gypsum wallboard, ceramic tile, acoustical ceiling panels, resilient flooring, carpet, wall coverings, painting), specialties (whiteboards & tackboards, metal door louvers, steel security screens, corner guards, signage, fire extinguishers & cabinets, toilet accessories, misc. specialties), special construction (lead-based paint control measures, fire alarm system), mechanical (plumbing, ceiling fans), electrical (electrical work), & other incidental related work. Estimated construction cost is between $1,000,000 - $5,000,000. | ||||||||||||
|
Plan Holders of Record: BCP Construction of Hawaii, Inc 836-6779 Fax 836-5807 T. Iida Contracting, Ltd 247-4241 Fax 235-1378 |
Ralph S. Inouye Co., Ltd 839-9002 Fax 833-5971 Universal Construction, Inc 845-3986 Fax 842-3881 | |||||||||||
|
*O969 Mililani Waena Elementary School |
Reroof Bldg D, DAGS 586-0518, Job No. 57-16-3568 |
11/06/03 2:00PM | ||||||||||
|
Work includes removal of existing asphalt shingle & built-up roofing system, removal of scuttle, flashing, gutters, & roof strainer; installation of metal siding, asphalt shingle roofing & shingle-ply roofing with insulation, installation of scuttle, flashings gutters, & roof drain strainer, & other incidental related work. Estimated construction cost is between $250,000 - $500,000. Site work (selective demolition), wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (asphalt shingles, preformed metal siding, elastomeric sheet roofing single-ply, flashing & sheetmetal, roof scuttle, sealants), finishes (painting). | ||||||||||||
|
*O973 Radford High School |
Reroof Bldg C, DAGS 586-0518, Job No. 57-16-3574 |
11/06/03 2:00PM | ||||||||||
|
Work includes removal of existing gravel built-up roofing system including but not limited to flashings, sealants & scuttle; installation of modified bitumen roofing system with tapered insulation, & installation of related items such as metal flashings, sealants, gutter & scuttle, & other incidental related work. Estimated construction cost is between $100,000 - $250,000. Site work (selective demolition), metal (metal fabrications), wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (modified bitumen sheet roofing-hot mopped, flashing & sheet metal, roof scuttle, sealants), finishes (painting). | ||||||||||||
|
*O974 Kalakaua Intermediate & Kalihi Elementary Schools |
Telecommunication & Electrical System Improvements, DAGS 586-0518, Job No. 12-16-4029 |
11/06/03 2:00PM | ||||||||||
|
Work includes site electrical/telecom ductlines & interior electrical & telecom systems improvements, & other incidental related work. Estimated construction cost is between $250,000 - $500,000. Site work (earthwork for utilities, soil treatment for vegetation control, asphaltic concrete paving, lawns & grass), concrete (cast-in-place concrete), thermal & moisture protection (sealants), finishes (painting), electrical (electrical work, communications). | ||||||||||||
|
Page Fourteen | ||||||||||||
|
| ||||||||||||
|
*O975 Pearl Harbor Elementary School |
Reroof Bldgs B, C & D, DAGS 586-0518, Job No. 57-16-3572 |
11/06/03 2:00PM | ||||||||||
|
Work includes removal of existing built-up gravel roofing system including flashings, gutters & ventilator, installation of modified bitumen roofing system with tapered insulation & installation of related items such as flashings & gutters, & other incidental related work. Estimated construction cost is between $250,000 - $500,000. Site work (selective demolition), wood & plastics (rough carpentry, preservative treated lumber), thermal & moisture protection (modified bitumen sheet roofing-hot mopped, flashing & sheet metal, sealants), finishes (painting). | ||||||||||||
|
*O976 Iroquois Point Elementary School |
Bldg H - Reroof, DAGS 586-0518, Job No. 58-16-4168 |
11/06/03 2:00PM | ||||||||||
|
The work shall generally consist of 1) removal of existing roofing system, sheet metal roof edging, flashing/counterflashing. 2) removal of existing gravity ventilator, 3) proper disposal of existing asbestos containing tar sealant/mastic compound, 4) installation of new modified bitumen sheet roofing system, sheet metal roof edging, flashing/counterflashing, 5) installation of new gravity ventilator, & other related work as indicated on the drawings. Estimated construction cost is between $100,000 - $250,000. | ||||||||||||
|
*O977 Honolulu International Airport |
90 Nakolo Place (Bldg 206) Improvements, DOT 587-2130, Project No. CO1401-63 |
11/06/03 2:00PM | ||||||||||
|
Work includes installing an accessible ramp & restriping part of the parking lot to make the building exterior ADA compliant, & installing a mailbox enclosure in the building lobby, & other related work. Estimated construction cost is between $25,000 - $75,000. | ||||||||||||
|
*O978 Kewalo Basin |
Substructure Repairs at Piers A & B, DOT 587-2130, Job No. H.C. 10155 |
11/06/03 2:00PM | ||||||||||
|
Work includes demolition of two fingers of Pier B, Kewalo Basin, construction of new buoy anchors at the two demolished finger piers & at two existing steel mooring piles, the buoy shall be furnished by the Harbors Division & picked up at the Harbors Division Maintenance Baseyard located 48 Sand Island Access Road; performing concrete repairs at all finger piers & access trestles of Piers A & B, Kewalo Basin; strengthening of selected finger pier beams with carbon fiber reinforced polymer (CFRP) laminates; applying protective coating to exposed surfaces of all finger piers & access trestles, & other in incidental related work. Estimated construction cost is between $150,000 - $300,000. | ||||||||||||
|
O946 Villages of Kapolei |
Bisecting Park - Replacement & Repairs of Designated Landscape Light Fixtures, HCDCH 587-0530, Job No. 03-020-K85-S |
11/12/03 2:00PM | ||||||||||
|
Work includes to replace light fixtures including ballast, replace tree floodlight fixture, replace remote ballast for tree floodlight fixture including repair of replacement of concrete base, test & replace luminaire bulb at tree floodlight fixtures as required to make operable, adjust tree light fixture height to +-12" height from ground elevation anchor loose conduit to tree; replace walkway light pole luminaire lens, test all lighting circuits from fixtures to breakers, troubleshooting & misc. electrical services, & other incidental related work. | ||||||||||||
|
Plan Holders of Record: C & C Electrical Contractor 847-6337 Fax 848-2831 |
Standard Electric, Inc 836-1677 Fax 834-1836 Ted's Wiring Service, Ltd 845-3533 Fax 842-0705 | |||||||||||
|
O736 Oahu, Add #1-5, |
Interstate Route H-3, H-3 Finish (Unit VIII) & Interstate Route H-1 Seismic Retrofit, Austin-Bishop Separation & Waiau Interchange, DOT 587-2130, Federal-Aid Project No. I-H3-1(75)/BR-H1(241) |
11/13/03 2:00PM | ||||||||||
|
The project is comprised of two packages: (1) Widening of the Interstate Route H-1 Freeway in the westbound direction from the Pearl City off-ramp to the Kaonohi Street overcrossing, & (2) Seismic retrofitting the Austin-Bishop Separation (Kaahumanu Street overcrossing) & the Moanalua Road Separation at Waiau Interchange. Work includes widening of the Waimalu Viaduct bridge structure, installation of retaining walls, installation of noise barrier walls, placing of Portland cement concrete pavement, installation of highway lighting, storm drainage & subsurface underdrainage systems, stabilization of deep soft soils, installation of a weigh-in-motion station, landscaping, & modifications to surface streets & acquired parcels below the viaduct. Estimated construction cost is over $15,000,000. Earthwork (clearing & grubbing, removal of structures/obstructions, excavation & embankment, excavation/backfill for conduits & structures ditch/channel excavation, water pollution/erosion control, dressing of shoulders, reinforced soil slope), bases ( plant mix asphalt concrete base, recycled plant mix asphalt concrete base course, aggregate subbase course, brooming off, plant mix glassphalt concrete base course, controlled low strength material (CLSM) for utilities/structures), pavements (asphalt concrete pavement, bituminous tack coat, Portland cement concrete pavement, prime coat for untreated permeable base course), structures (steel/structures, prestressed concrete, railings, drilled shafts, concrete masonry unit, deck expansion joint, segmental retaining wall, viaduct deck replacement concrete), incidental construction (structural concrete reinforcing steel, culverts/storm drains, manholes/inlets/catch basins, underdrains, guardrails, fences, sidewalks, curb and/or gutter, reinforced concrete driveways, grouted rubble paving, standard street survey monuments, sprinkler system, topsoil, grassed surfaces, planting/transplanting, traffic control signs, roadway lighting system, water/sewer systems, shotcrete, traffic signal system, pavement markings, microcomputer system, field office & project site laboratory, lined drainage ditch, traffic control devices, electric system, curb ramps, telephone/cable television system, curb ramps, cold planing of existing pavement, structural plate culvert lining, restrainers, drilling holes & installing dowels, soil nail retaining wall, soil stabilization by jet grouting, gravel blanket, herbicide, composite epoxy resin-fiber system, erosion control matting, emergency telephones, glass fiber reinforced polymer rebar, trenchless sleeves, permanent tieback anchors, removal of lead-containing materials, moveable concrete barrier, moveable concrete barrier transfer machine, weigh-in-motion system, | ||||||||||||
|
Page Fifteen | ||||||||||||
|
| ||||||||||||
|
mobilization), materials (bituminous materials, aggregates, concrete, clay & plastic pipe (PVC), fence & guardrail, reinforcing steel, wire rope & prestressing steel, etc.). A mandatory Pre-Bid Meeting is set for May 22, 2003 at 10:00am at the Oahu District Office, 727 Kakoi Street, Honolulu, HI 96819 to explain & clarify any questions regarding this project, to provide firms with any requirements & to inform DBEs contracting, subcontracting & vendor opportunities. | ||||||||||||
|
Plan Holders of Record: Abhe & Svoboda, Inc 682-4833 Fax 682-0780 Dick Pacific Construction Co., Ltd 533-5000 Fax 533-5339 Global Specialty Contractors, Inc 843-8881 Fax 843-8883 Goodfellow Brothers, Inc 879-5205 Fax 879-6724 Hawaiian Dredging Construction Co 734-3211 Fax 734-3232 KD Construction, Inc 847-0229 Fax 851-7311 |
Kiewit Pacific Co 674-1088 Fax 674-1233 Mega Construction, Inc 839-0022 Fax 839-7191 Robison Construction Inc 838-1360 Fax 838-7639 Rons Construction Corp 841-6151 Fax 842-1451 Royal Contracting Co., Ltd 839-9006 Fax 839-7571 The Nakoa Companies 373-7273 Fax 373-7119 | |||||||||||
|
O934 Oahu |
Municipal Solid Waste Recycling Facility, C of H 523-4682 Fax 423-4847, Project Engineer: Wilma Namumnart @ 692-5378 |
01/29/04 3:00PM | ||||||||||
|
Soliciting bids on a full-service contract to design, engineer, construct, operate, & maintain for ten (10) years a Municipal Solid Waste Recycling Facility which when operating at the Guaranteed Capacities of municipal solid waste specified in the Offeror's Proposal, will produce a marketable product. Mandatory pre-submittal conference on 10/23/03 @ 2:00p.m. at the Kapolei Hale, 1000 Uluohia Street, Kapolei. | ||||||||||||